Download Print this page

Paragon Pro The Troll 2721 Assembly Instructions page 3

Material handling cart

Advertisement

Step 12:
Slide in the adjustable side arms to
one of two positions. Pull down on the
spring-loaded pin to allow movement.
(Note: Outer position of the side arms
will allow 4' wide material such as wall
board to be centered on the cart.)
Thank you
For choosing one of our great products
7251 So. 42nd St.
Grand Forks, ND 58201
1.800.441.0551
Note: Assembly sequence requires
lifting and positioning heavy
components. Procedure may
require two people.
Parts Included:
Frame tubes
Axle frames
End handle section
8" Casters
Adjustable side arms
Fasteners:
1/2" U Bolts
1/2" Flat washers
1/2" Lock washers
1/2" Hex nuts
3/4" x 2" Bolts
3/4" Lock nuts
3/8" x 1" Bolts
3/8" Lock nuts
5/16" Flat washers
MATERIAL HANDLING CART
4
3
2
6
4
20
40
40
40
2
2
24
24
48
®

Advertisement

loading