Metal Fido/Trimline 35 & 50
®
Important Note: Ensure that all relevant personnel read the points listed below and that a copy
Installation Instructions
Electric/Cordless Power Drill
o
Masonry Drill Bit N
14 (9.32")
17mm Socket / Spanner
Screwdriver
Hammer
Marking Implement
Safety Glasses
A - Bin Outer c/w Lid
B - M10 Washer x4
C - M10 Shake Washer x4
D - Hex-Head Screw x4
E - Top Bracket x1
F - Bottom Bracket x1
o
G - N
12 Wall Screws x 4
o
H - N
12 Plastic Wall Plugs x 4
J - M8 Washer x4
1 After deciding where to site the bin and at what height, use the top
bracket (E) as a guide to mark the position of the two holes on the
wall. Ensure the two holes are horizontal and the correct distance
apart (as shown above in illustration).
2 Now mark the position of the two holes for the bottom bracket (F).
Do this by measuring 420 mm vertically down from each of the top
two holes.
3 When you are happy with the positioning of the holes, drill and
plug the wall, ready to accept brackets and screw fixings.
4 Using the wall screws (G) fix the top and bottom brackets onto the
wall.
5 Offer bin up to fixed wall brackets. Use washers (B & C) and
screws (D), to fix the bin to the brackets from the inside of the bin.
6 Ensure all of the fixing assembly is tightly secured.
TM
Installation Instructions
PERMANENT WALL MOUNTING
is passed on to staff involved with the installation
A
TM
B
D
C
G
J
E
H
F
Need help?
Do you have a question about the Metal Fido 35 and is the answer not in the manual?
Questions and answers