Download Print this page

Walton 20X10 SHIPLAP WORKSHOP General Instructions Manual page 11

Advertisement

Step 20
Rim lock fixing
Fig 1. (internal view)
Place the lock onto internal
24
horizontal framing ensure
alignment with the pre
drilled holes before fixing.
Align Lock keep with lock
and fix with screws provided.
Do not over tighten the
screws, otherwise the
locking mechanism will not
work.
Fig 2.
Place door handle bar
through the lock as in
Flat head
Grub Screw
diagram, fix door handle
onto bar with the flat headed
grub screw.
fig 3. (External view)
Fir the door handle cover
over the bar and fix with
2x30mm screws provided. Fix
the door handle onto bar
with the flat headed grub
screw as in diagram.
Step 21
Rim lock
Fix the casement stay to the
opening window then align
the fixings onto the window
Screws provided with lock
panel frame. Ensure the case-
Do not over tighten the screws
ment stay fits into fixings when
closed before screwing them
down using 18 x 20mm screws.
Step 22
Fix pad bolt block to the side
2x30mm screw
door using 2x40mm screws as
shown in the illustration.
2x30mm screws
2x40mm screws
29
6x20mm screws per casement stay
P 11

Advertisement

loading