Download Print this page

Advertisement

Quick Links

CONTENTS
Please read and understand this installation guide fully before attempting to install the product.
Always allow new screeds to fully dry before applying the final finish of waterproofing and tiles.
Further guidance can be found in BS 8204 or BS 5385-3:2007
Please follow all installation guides supplied with the Linear drain and waterproofing systems.
Section 1, Components
Section 2, Configuration types
Section 3, Basic assembly rules
Section 4, General Installation guidance
Section 5, Assembly methods
If you require any further information about this product please contact our technical team on: 01460 258 682
SAFETY
Please read these installation instructions carefully before proceeding.
Keep guide for future reference.
Incorrect installation will invalidate the guarantee.
Make sure there are no hidden pipes or cables in the floor or walls where you intend to drill.
Wear safety goggles, shoes and appropriate clothing.
Impey Showers, Conquest Business Park, Ilton, Somerset, TA19 9EA, TEL: 01460 256090 FAX: 01460 259800
info@impeyshowers.com
Aqua-Grade Linear
Installation Guide
Page 2
Page 3
Page 4
Pages 5-7
Pages 8-12
www.impeyshowers.com
Issue 2
01/12/15

Advertisement

loading
Need help?

Need help?

Do you have a question about the Aqua-Grade Linear and is the answer not in the manual?

Questions and answers

Summary of Contents for impey Aqua-Grade Linear

  • Page 1 Make sure there are no hidden pipes or cables in the floor or walls where you intend to drill. • Wear safety goggles, shoes and appropriate clothing. Impey Showers, Conquest Business Park, Ilton, Somerset, TA19 9EA, TEL: 01460 256090 FAX: 01460 259800 Issue 2 info@impeyshowers.com www.impeyshowers.com...
  • Page 2 SCR05 M8 Foot AGLNR40, starter section for 400mm Linear drain AGLNR60, for 600mm drain AGLNR80, for 800mm drain (Section supplied will be dependant on configuration and size of Aqua-grade Linear) SCR06 Spacer M8 foot only) SCR/FMP Foot mounting plate SCR/INF15R/GN...
  • Page 3 Section 2: Configuration types The Aqua-grade Linear may be arranged in a wide range of sizes and configurations, use this section to familiarise yourself with the 4 main types. 0 Walls required, 4 falls of gradient 1 Wall required, 3 falls of gradient...
  • Page 4 Section 3: General Installation guidance for all configuration types This section is an introduction to the basic installation and assembly rules for Aqua-grade Linear. It is important that you have read and understand these requirements before commencing installation. Always work in a clockwise or right to left direction The blue corner section must always have 2 feet fitted.
  • Page 5 This section covers parts of the installation that are are common to all configuration types. Please see section 5 and follow the relevant stages that are applicable to the type you are installing. Determine where the Aqua-grade linear will be installed. Measure out and mark the position of the waste pipe (if the product is being installed into an existing floor the and gully.
  • Page 6 Section 4: General Installation guidance for all configuration types This section covers parts of the installation that are are common to all configuration types. Please see section 5 and follow the relevant stages that are applicable to the type you are installing. Ensure screw is fitted to connect gully to Linear channel.
  • Page 7 Section 4, General Installation guidance for all configuration types This section covers parts of the installation that are are common to all configuration types. Please see section 5 and follow the relevant stages that are applicable to the type you are installing. When the first section has been adjusted continue adding Working in a clockwise direction continue to add parts.
  • Page 8 Section 5, Assembly order for 4 falls, no walls configuration Please follow these steps as a general guide for this type of configuration, (alternative sizes are available) Always work in a clockwise or right to left direction. After each row is completed ensure the outside edge is level. Page 8...
  • Page 9 Section 5, Assembly order for 3 falls, 1 wall configuration Please follow these steps as a general guide for this type of configuration, (alternative sizes are available) Always work in a clockwise or right to left direction. After each row is completed ensure the outside edge is level. Page 9...
  • Page 10 Section 5, Additional information for 2 walls, 2 falls configuration The configuration with 2 falls 2 walls (corner drain) can be assembled as Left hand and Right hand version. The assembly process for these is slightly different, please see notes below and assembly guide for these types on page 11 Parts for both versions are supplied in the pack, these parts are very similar, please see notes to assist with identification Left Hand Configuration Right Hand Configuration...
  • Page 11 Section 5, Assembly order for 2 falls, 2 walls configuration (left and right hand) Please follow these steps as a general guide for this type of configuration, (alternative sizes are available) Always work in a clockwise or right to left direction. After each row is completed ensure the outside edge is level.
  • Page 12 Section 5, Assembly order for 1 fall, 3 walls configuration Please follow these steps as a general guide for this type of configuration, Always work in a clockwise or right to left direction. After each row is completed ensure the outside edge is level. Page 12...