Download Print this page

Advertisement

Quick Links

MOD 7 – ASSEMBLY INSTRUCTIONS
Parts List
A - 2 x Main Beams, scarfed both ends, pre-drilled –
1.5mtrs Length
B - 3 x Cross Raft er, scarfed both ends – 1.5mtrs Length
C - 4 x Posts, Notched and Pre-Drilled - 2.4mtrs Length
D - 8 x Struts Pre-Drilled
E - 12 x Angle Brackets
F - 4 x Coach Bolt Sets (bolt, washer and nut)
G - 72 x Wood Screws (for angle brackets) 25mm x No.8
H - 16 x Wood Screws (for struts) 50mm x No.8
I -
4 x Post Fixings (Spike, Concrete-In or Bolt-Down
incl. ankerbolts)
Fig 2. - Marking Out Post Positi ons
With a measure make sure lines
A and B are the same length.
* N.B.: Please take measurement
dimensions to CENTRE of post fi xings.
Fig 3. - Fitti ng of Post Supports
Opti on 1:
Original Spiked System
Fig 1. - Module 7
1000mm
Opti on 2:
Bolt Down System
Perfect Pergolas Ltd, PO Box 283
Cirencester, Glos GL7 9EY
e: info@perfectpergolas.co.uk
w: www. perfectpergolas.co.uk
1000mm
Arti sti c impression – not to scale
Opti on 3:
Concrete-in System
x 4 Ankerbolts
included
t: 0844 800 4703

Advertisement

loading

Summary of Contents for Perfect Pergolas Module 7

  • Page 1 Perfect Pergolas Ltd, PO Box 283 Cirencester, Glos GL7 9EY t: 0844 800 4703 e: info@perfectpergolas.co.uk w: www. perfectpergolas.co.uk MOD 7 – ASSEMBLY INSTRUCTIONS Fig 1. - Module 7 Parts List A - 2 x Main Beams, scarfed both ends, pre-drilled –...
  • Page 2 As some of the screws & bolts may have become loose during assembly, it is important to re-check that they are ti ght and ensure they are securely fastened. For further informati on, please go to www.perfectpergolas.co.uk © Perfect Pergolas Limited 2014...