Antec ALEXYS OR 100 User Manual page 16

Organiser rack
Table of Contents

Advertisement

16
User manual OR 100 /110, ed. 5
specifications as described in the section operating environment.
Fig. 3. Lift instruction OR 100 organiser rack (left side) and OR 110 (right-
side).
Installation of OR 100
The installation procedure of the OR 100 consists of the following steps:
1. Remove the aluminium covers in front of the pulse damper and degas-
2. Put the LC 100 pump into the OR 100 organiser rack with its feet into
3. Stack the AC 100 acquisition controller on top of the LC 100 pump
Fig. 4. Stacking LC 100 pump on OR 100 organiser rack.
ser to avoid scratches on pump and controller during installation. Gen-
tly pull on the covers until they release (snap-in connectors).
the holes of the alignment plate as depicted in Fig. 4.
(see Fig. 5.).

Advertisement

Table of Contents
loading

Related Products for Antec ALEXYS OR 100

This manual is also suitable for:

Alexys or 110

Table of Contents