Octagon Cedar
Gazebo
Assembly Manual

Advertisement

loading
Need help?

Need help?

Do you have a question about the Octagon Cedar Gazebo and is the answer not in the manual?

Questions and answers

Summary of Contents for YardCraft Octagon Cedar Gazebo

  • Page 1 Octagon Cedar Gazebo Assembly Manual...
  • Page 2 Ladders Questions? Issues with Damaged or Missing Parts? In order to best assist you, please contact YardCraft directly, NOT a third part retailer, with any questions regarding our products, damages, or replacement parts. This will help you get what you need as quickly as possible! Call us at 866-210-9273...
  • Page 3 Parts List (Included) (120) 2 1/2” Screws (40) 2 1/2” S. S. (206) 3’’ Screws (20) 1 3/4” Concrete Screws Screws (1) Square Drive & (1) (520) 2’’ Nails (8) 3/8”x5” Roof (100) 10 D Nails Bolts. (16) Washers Hex Drive Bit &...
  • Page 4: Parts List

    Parts List (8) Floor Band Board (8 of each size) Diagonal Floor Joist (8) Double 2x4 Floor Joist ( 2) Floor Joist Connection Plate (8 of each size) Floor Boards (1 of each size) Center Floor Boards (7)Hand Rails, (63) 1x3 Spindles & (7) 2x3 (8) Brace Section (16) Outside ply &...
  • Page 5 Floor Assembly Set your Gazebo Package as close to the building Remove protective shrink wrap. Do not unwrap un- site as possible. til you are ready to build. Keep dry and protected until you are ready to assemble the Gazebo. If you did not purchase a floor, skip to page 12.
  • Page 6 Floor Assembly Align the short point of the 2x4 Band Board with Align Long Point of adjacent 2x4 Band Board the long point of the Joist and fasten Band Board to and attach to Joist using two (2) 3’’ Brown Screws Joist using two (2) 3’’...
  • Page 7 Floor Assembly 45° 45° 22.5° 45° 22.5° 22.5° Place the 45° angle against the Double Joist and Locate the Diagonal Floor Joists. the 22.5° against the Band board Pre-drilled Holes in Band Board Place remaining Diagonal Floor Joists in Place as Align the center of the 2x4 Diagonal Joists with the shown.
  • Page 8 Floor Assembly Longest Floor Board Locate the Longest Floor Boards. Place each of the Longest Floor Boards around the outside perimeter of the floor. Alignment Align Floor Board at center of Double Joist. Keeping the Floor Board aligned with the center of the Double Joist at each end, Measure from the Band Board to the outside edge of the Floor Board.
  • Page 9 Floor Assembly Continue around the outside of the Floor and attach Pre-drill one 3/16” hole through Floor Boards above all remaining Long Floor Boards. each 2x4 Diagonal Floor Joist and one (1) hole in the center into Band Board. Then fasten using 2 1/2” Screws, one (1) at each pre-drilled locations..
  • Page 10 Floor Assembly Fasten the Second Floor Boards, as shown in Install the Third Floor Boards, as shown in previous steps. previous steps. Center Floor Boards Locate the Center Floor Boards. Install all remaining Floor Boards, as shown in previous steps. Place Center Floor Boards as shown.
  • Page 11 Floor Assembly Fasten Center Floor Boards to Joist using twelve Using a 3/16” Drill Bit, drill through the Floor (12) 2 1/2” Screws. (One (1) Screw at each Boards into the 2x4 Diagonal joist and fasten using pre-drilled hole.) 2 1/2” Screws. (One (1) Screw at each pre-drilled hole.) Band Board Cedar Floor Trim...
  • Page 12 Post and Rail Assembly Locate the Cedar Hand Rail and place on a clean Install remaining Cedar Floor Trim, as shown in flat surface. previous step. Locate the 1x3 Spindles. Place the 1x3 Spindles Spindles Placed into Hand Rail. into the Pockets of the Cedar Hand Rail. Locate the 2x3 Bottom Rail and Place 1x3 Fasten 1x3 Spindles to 2x3 Rail using one (1) 1 1/4”...
  • Page 13 Post and Rail Assembly Install the 1 1/4” Screws at these six (6) Locations. Place the assembled Bottom Rail Sections off to the side. Long Point Locate the Outside Post Plies and place on a clean Ensure the long Point is facing up. level surface.
  • Page 14 Post and Rail Assembly Spacer Block Place the Brace Section in the notch in the Outside Locate and place the Spacer Block underneath the Post Ply. Brace. Push Brace sections tight against Post Ply and Fasten the opposite end of the Brace Section to the attach using two (2) 3”...
  • Page 15 Post and Rail Assembly Place the Bottom Rail Section in the notch in the Push Bottom Rail section tight against Post Ply and Outside Post Ply. attach using two (2) 3” Screws through pre-drilled holes as shown. Fasten using two (2) 3” Screws through pre-drilled Fasten the opposite end of the Bottom Rail holes.
  • Page 16 Post and Rail Assembly Inside Post Ply Align Here Start with the door section. Locate the Inside Post Align the angle cut of the Inside Post Ply with Ply. the Outside Post Ply. Fasten using 2 1/2” Screws through pre-drilled holes. Inside Second First...
  • Page 17 Post and Rail Assembly L Bracket Install all remaining Post & Rail Sections, as Locate the L Brackets. shown in previous steps. Measure the opening at the top of the doorway. Center the L Bracket on the Post and fasten with four (4) 2 1/2”...
  • Page 18 Using a 3/16” wood drill bit, drill into the Deck Fasten L Bracket to the Floor with two (2) 4” Boards through the holes in the L Bracket. Timber Lock Screws through pre-drilled holes. Repeat these steps at each Post location. If You did not purchase a floor with your gazebo,...
  • Page 19: Roof Assembly

    Roof Assembly 2x4 Double Rafter Prepare Roof Bolts by putting one (1) nut and one Locate the Double 2x4 Rafter. (1) washer on one end of the Roof Bolts as shown. Do not tighten Nut. Align these two holes Place the Double 2x4 Rafter into the slot at the top Place the Roof Bolt through the pre-drilled of the Post and align the hole in the Rafter with the holes in the Post and 2x4 Double Rafter.
  • Page 20 Roof Assembly Install the Rafter directly opposite of the previously Locate the Compression Ring. installed Rafter, as shown in previous steps. Lift Compression Ring into place. Pull Rafters down against the lip on the Install another Rafter as shown in previous steps. Compression Ring.
  • Page 21 Roof Assembly Ensure all Rafters are fastened to the Compression All Screws installed. Ring. Roof Band Board Locate the Roof Band Board. Place edge of Roof Band Board in center of the Double Rafter. Fasten Roof Band Board to the Rafter using two If Roof Band Board is short on the other side, Push (2) 3’’...
  • Page 22 Roof Assembly Align Here Fasten Here Lift next Roof Band Board into place. Align the Fasten using two (2) 3’’ Screws through pre-drilled end with the previously installed Roof Band Board. holes. Fasten with two (2) 3” Screws. Install all remaining Roof Band Boards, as shown Tighten Roof Bolts at all Post locations, using a 5/8”...
  • Page 23 Roof Assembly Fasten 1x6 T&G Boards to Rafters at each end Align the 1x6 T&G Board to the Band Board and using two (2) 2” Nails per end. Fasten in the center using one (1) 2” Nail. Fasten each board along both ends using two (2) 2”...
  • Page 24 Roof Assembly Align the top of the Roof Fascia Board with the top Fasten Fascia Board to Roof Band Board using of the 1x6 T&G Boards and flush with the Roof 1 5/8” Screws through pre-drilled holes. Band Board at each end. Align Here Three (3) Screw locations.
  • Page 25 Post Trim Place the Hurricane Plate on top of the 1x6 T&G Install one Hurricane Plate at each Roof Splice, as Boards. Center the Hurricane Plate between the two shown in previous steps. roof panels and fasten the plate to the Rafters and the Band Board below using one (1) 10 D Nail in each hole.
  • Page 26 Post Trim Install the rest of the Post Trim on the outside of Locate the Post Trim with no notches. each Post, as shown in previous step. Center on the inside of the Post and fasten with Keeping the Post Trim centered on the Post, work 1 5/8”...
  • Page 27 Tar Paper Overlap Fasten Tar Paper to T & G using a Hammer Tacker. Place the Small Tar Paper piece on the top side. Overlap the Small piece over the Large piece by 2”. Fasten using a Hammer Tacker. Ridge Tar Paper Install the Tar Paper on each Roof Section, as Locate the Ridge Tar Paper.
  • Page 28 Tar Paper installed. Ready for Shingles. Your Gazebo is now ready for shingles and good times!
  • Page 29 Congratulations! Enjoy your new Gazebo! YardCraft.com Info@YardCraft.com 191 Jalyn Drive New Holland PA 17557 1-844-442-1615...