Henderson's Line-Up SuperSteer SS308 Installation Instructions

Henderson's Line-Up SuperSteer SS308 Installation Instructions

Rear trac bar

Advertisement

Installation Instructions
Part #SS308 - Rear Trac Bar
The design of this product is to eliminate the side shift of the rear axle
of the Fred Freightliner Chassis
Estimated Installation time is 1.5 hours.
*A qualified mechanic using normal automotive tools and following all safety measures known
should perform installation of this product.
Please familiarize yourself with all the components depicted below.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SuperSteer SS308 and is the answer not in the manual?

Questions and answers

Summary of Contents for Henderson's Line-Up SuperSteer SS308

  • Page 1 Installation Instructions Part #SS308 - Rear Trac Bar The design of this product is to eliminate the side shift of the rear axle of the Fred Freightliner Chassis Estimated Installation time is 1.5 hours. *A qualified mechanic using normal automotive tools and following all safety measures known should perform installation of this product.
  • Page 2 A. Preparation Move the coach to a level, flat surface. If necessary, drive the rear wheels of the coach onto 4” high blocks and set the brakes or you may drive the coach over a work pit and chock the front wheels.
  • Page 3 D. Installation of Rod Assembly With the coach at normal ride height, install the adjustable end of the rod assembly to the frame bracket. Use one of the supplied 3/4” x 3” bolts, two washers, and nut and assemble loosely. Adjust the length of the rod to reach the axle bracket and bolt on with the supplied 3/4”...
  • Page 4 Your comments are greatly appreciated. Please contact SuperSteer ® 888-898-3281 or e-mail at sales@supersteersuperstop.com Thank you for your purchase of the SuperSteer Rear Trac Bar. ® Revised 06.25.08 mg...

Table of Contents