Records; Correct Installation Form - Harken Industrial R27 Instruction Manual

Rail
Table of Contents

Advertisement

With reference to the installation of the fall arrest system installed on
System serial number:
Description of the building:
Address:
City:
The INSTALLER
First name:
Legal representative of the company:
With headquarters at:
VAT number:
Manufacturer
In compliance with the manufacturer's installation instructions, they have been installed in compliance with
the project drafted by the Arch./Eng./Surv.:
They have been fastened to the specified structure, in compliance with the instructions supplied in the
calculation report drafted by the Arch./Eng./Surv.:
They have been fixed as specified (e.g. numbers of bolts, correct materials, correct position/location).
They have been commisioned in accordance with the manufacurer's information.
They have been supplied with photographic information/documentation, especially where fixing (e.g. bolts)
and the under lying substrate are no longer visible after completing the installation.
The fastening/anchoring element structural characteristics, their use instructions, the manuals of the different
products used, the installation layout and the documents/pictures taken and drafted during the installation
have been submitted to Mr./Mrs.
First name:
Role:
has been affixed near every access and/or onto the fall arrest system
System installation date
20/03/19

CORRECT INSTALLATION FORM

Project:
that the following systems and fastening devices used
Product
HAVE BEEN INSTALLED CORRECTLY
The compulsory SIGN
Country:
Last name:
DECLARES
Model
Last name:
ENGLISH
Post code:
City:
Type
Tensile forces allowed
The installer
(Stamp and Signature)
23

Advertisement

Table of Contents
loading

Related Products for Harken Industrial R27

This manual is also suitable for:

In643In643.clearIn1650In1650.clear

Table of Contents