Table of Contents

Advertisement

Quick Links

Part No. 061357
HARBEN
CENTURY PUMP
SERVICE MANUAL
This manual contains
IMPORTANT Safety Information
Flowplant Group Ltd
Issue 7 March 2017

Advertisement

Table of Contents
loading

Summary of Contents for HARBEN CENTURY

  • Page 1 Part No. 061357 HARBEN CENTURY PUMP SERVICE MANUAL This manual contains IMPORTANT Safety Information Flowplant Group Ltd Issue 7 March 2017...
  • Page 2 Flowplant Group Ltd. Harben Inc. Gemini House P.O.Box 2250 Brunel Road Cumming Churchfields Ind. Est. GA 30028 Salisbury USA. Wiltshire, SP2 7PU England t:+44 (0)1722 325 424 t:+1 770 889 9535 f:+44 (0)1722 411 329 f:+1 770 887 9411...
  • Page 3 FLOWPLANT CENTURY PUMP SERVICE MANUAL AMENDMENTS Change Page(s) Amended Date Signature Number Re-formatted 05/16 Warranty section amended 10/16 Re-formatted / Health & Safety 28/11 section amended Updated drawings 22/03 AMENDMENTS...
  • Page 4: Table Of Contents

    HARBEN CENTURY TYPE PUMP SERVICE MANUAL Contents Section Page FOREWORD HEALTH AND SAFETY AT WORK SECTION 1 PUMP TECHNICAL DATA SECTION 2 PUMP INSTALLATION SECTION 3 GENERAL OPERATING INFORMATION SECTION 4 PUMP MAINTENANCE AND OVERHAUL PROCEDURES SECTION 5 WARRANTY A detailed contents list precedes each section...
  • Page 5: Foreword

    Flowplant Century Pump Manual FOREWORD This manual is primarily concerned with the Harben Century Type Pump. In addition, general safety and operating information for the equipment into which the pump is installed is also included. The conversion of pressurised water into a high velocity jet and its use as a cleaning and cutting tool is now familiar to, and used by, many people in a wide range of industries.
  • Page 6: Health And Safety At Work

    Flowplant Century Pump Manual HEALTH AND SAFETY AT WORK There are two main categories of risk. These are: a) Injury from impact of water b) Injury from environment. All persons involved in water jetting should be made aware of the risks.
  • Page 7 Flowplant Century Pump Manual If any person, object or article is accidentally struck by the jet, this fact must be reported to the operator's representative. INJURY FROM ENVIRONMENT Work should only be carried out if it is safe to do so. A thorough examination of the site should be carried out before work is started.
  • Page 8 SAFETY CODE OF PRACTICE Full details of the Safety Code of Practice, when working with equipment containing a Harben pump, are given in Section 3 of this manual. The basic rules of this code are as follows: ALWAYS WEAR THE CORRECT PROTECTIVE CLOTHING.
  • Page 9 Flowplant Century Pump Manual POTENTIAL HAZARDS AND MISUSE OF HIGH PRESSURE EQUIPMENT Failure to follow the instructions where this icon is shown can result in serious injury or even death  Never use a jetter that isn’t regularly serviced according to the manufacturer’s recommendations.
  • Page 10 Flowplant Century Pump Manual POTENTIAL HAZARDS AND MISUSE OF HIGH PRESSURE EQUIPMENT Failure to follow the instructions where this icon is shown can result in serious injury or even death  Before starting work, check and ensure the drain jets have no blocked holes or nozzles as this may cause the pumping system to over pressurise which could result in burst disc failure or bursting the jetting hose.
  • Page 11 Flowplant Century Pump Manual POTENTIAL HAZARDS AND MISUSE OF HIGH PRESSURE EQUIPMENT Failure to follow the instructions where this icon is shown can result in serious injury or even death  When using a venturi jet pump to remove fluid from a flooded manhole never place your fingers into the pump inlet as they could be trapped by the vacuum and cause injury.
  • Page 12 Flowplant Century Pump Manual POTENTIAL HAZARDS AND MISUSE OF HIGH PRESSURE EQUIPMENT Failure to follow the instructions where this icon is shown can result in serious injury or even death  Always ensure that an adequate area is cordoned off around the working zone so that flying debris and contamination cannot injure passers-by.
  • Page 13 Flowplant Century Pump Manual PERSONAL PROTECTIVE EQUIPMENT (PPE) All persons using high pressure water jetting equipment should use all necessary PPE suitable for the task being carried out. This includes, but is not limited to:  Ear protection  Eye protection: a helmet with chin guard and visor is recommended ...
  • Page 14: Pump Technical Data

    Section 1 Pump Technical Data...
  • Page 15 Section 1 Technical Data Contents Section Page 1.1 Introduction 1.2 Pump Description 1.2.1 Function 1.2.2 Filtration 1.2.3 Fluid Flow 1.3 Identity 1.3.1 Manufacturer 1.3.2 Pump Operation / Identification 1.4 Design and Performance Data 1.4.1 Physical Data 1.4.2 Performance Characteristics 1.5 Equipment Details 1.6 Associated Publications Illustration Page...
  • Page 16 Flowplant Century Pump Manual 1.1 INTRODUCTION The Harben Century Type high pressure pump (Fig 1.1) is a radial piston diaphragm pump which can be used for a number of industrial applications, including the following: (a) High pressure cutting of board, plastic and other materials...
  • Page 17: Pump Description

    1.2 PUMP DESCRIPTION 1.2.1 Functional The following description of the Harben Century Type Pump applies equally to the 4 and 8 cylinder variants. Performance details of each type of pump are given later in this section. The Century pump works on the radial piston design principle which uses one-way valves in conjunction with tubular diaphragms, fitted with an internal support or mandrel.
  • Page 18 1.3.2 Pump Options/Identification The Century Pump is available in either 4 or 8 cylinder options, with each having a choice of piston/cylinder diameter options of 22.5 mm, 25.0 mm or 27.5 mm. All barrels are given a letter code to indicate their position in the crankcase (refer to Section 4, Fig 4.2).
  • Page 19: Design And Performance Data

    Note: for full details of the pump physical data refer to Fig 1.1. 1.4.2 Performance Characteristics For full details of the Century Series, Pump performance data, reference should be made to the appropriate information given in Tables 1.2 and 1.3a/b.
  • Page 20: Equipment Details

    Flowplant Century Pump Manual 1.5 EQUIPMENT DETAILS Details relevant to the pump and associated equipment should be entered on the form shown in Table 1.3, at the rear of this section, for future reference. 1.6 ASSOCIATED PUBLICATIONS Associated with this manual are the following publications: Operators guide Part no.
  • Page 21 CENTRE LINE OF PUMP DIMENSIONS (IN mm) ARE IDENTICAL FOR ALL PUMP MODELS i.e. 4 & 8 CYLINDERS ROTATION VIEW ON DRIVE END OF SHAFT (NOTE CAST ARROW ON INLET SIDE OF PUMP) Fig 1.1 Harben Century Type High Pressure Pump...
  • Page 22: Performance Data Litres

    MAX W.P. 550 BAR - 825.019 & 425.019 MAX W.P. 550 BAR - 825.019 & 425.019 NB. Max. speed of Century Pump 1200 rpm NB. Max. speed of Century Pump 1200 rpm MAX W.P. 420 BAR - 827.519 & 425.019 MAX W.P.
  • Page 23 MAX W.P. 700 BAR - 822.519 & 422.519 Century Pump Performance Graphs (1000 R.P.M) MAX W.P. 550 BAR - 825.019 & 425.019 NB. Max. speed of Century Pump 1200 rpm MAX W.P. 420 BAR - 827.519 & 425.019 427.519 12000...
  • Page 24 Flowplant Century Pump Manual Pump Type Pump Serial No(s) Engine Type Engine Serial No Gearbox Type Gearbox Serial No Motor Frame / kW Motor Serial No Max. Working Pressure of Pump Max. Flow at Above Pressure Single Gun HV Jet Size Single Gun 15 Deg.
  • Page 25: Pump Installation

    Section 2 Pump Installation...
  • Page 26: Introduction

    Page 2.1 Pump Installation – Water Circuit Layout 2.2 Pump Installation – Prime Mover Arrangements Tables Table Page 2.1 Century Gearboxes 2.2 Couplings for Century Gearboxes 2.3 Flywheel Couplings Perkins/Ford 2.4 Motor Half Couplings for Electric Motors 2.5 Bell Housings...
  • Page 27 Refer to Section 1 for technical data and a description of the pump. Section 1, Fig 1.1 should be referred to for further technical details and installation data. The illustration given in Fig 2.1 Century Series pump. Fig 2.1 Pump Installation – Water Circuit Layout...
  • Page 28 2.2 PUMP MOUNTING 2.2.1 General Details The Century Series pumps are designed for direct drive and flange mounting. The normal operating speed is 1000 rpm, nominal. Maximum operating speed is 1200 rpm. The pump must rotate anticlockwise, looking at the front of the pump ('arrow' cast into crank- case).
  • Page 29 Flowplant Century Pump Manual 2.2.3 Coupling Arrangements Arrangements are made on the pump for the incoming fluid to cool the crankcase oil. The use of standard diaphragm/barrel assemblies provides a choice of flows, depending upon the number of barrels fitted to a crankcase. The cylindrical form of these barrels is well suited to containing high pressures.
  • Page 30 2.25:1 Gearbox Bare Shaft Century 105-121 2.0:1 Gearbox Bare Shaft Century 105-125 1.86:1 Gearbox Bare Shaft Century TABLE 2.2 COUPLING FOR CENTURY GEARBOXES PART NO DESCRIPTION 100-342 Output Coupling B200 Pt 1, Flex Bore 57 mm, Key 16 mm 100-366...
  • Page 31 Flowplant Century Pump Manual 2.3 INLET WATER 2.3.1 General It is recommended that inlet water is filtered to 50 microns. Filtration to 150 microns is also possible. Refer to Flowplant Group for advice. Flowplant offer types of filter suitable for most applications.
  • Page 32: General Operating Information

    Section 3 General Operating Information...
  • Page 33 Section 3 General Operating Information Contents Section Page 3.1 Introduction 3.2 Safety Code of Practice 3.2.1 General 3.2.2 Safety Gun 3.2.3 Drain/Sewer and Pipe Cleaning 3.2.4 Hoses 3.2.5 Underwater Recoil-less Safety Gun 3.2.6 Tube Cleaning 3.2.7 Hoverclean 3.2.8 Abrasive injection Equipment 3.2.9 Accidents 3.2.10 Protective equipment 3.3 General Operating Instructions...
  • Page 34: Introduction

    Flowplant Century Pump Manual 3.1 INTRODUCTION This section gives general information on safety, protective clothing to be used by operators, and general starting and stopping procedures when the pump is incorporated in a machine. It should be remembered that the operating procedures given are to be used as a guide only, and the equipment handbook operating procedures should be used where applicable.
  • Page 35: General

    Flowplant Century Pump Manual 3.2.1 General Only a responsible person who has received instruction in the operation of high pressure water jetting equipment should be allowed to operate the equipment. Barriers should be erected around the cleaning bay or where the work is being done 'in- situ', round the section of plant concerned.
  • Page 36: Drain/Sewer And Pipe Cleaning

    3.2.5 Underwater Recoil-less Safety Gun The Harben Underwater Recoil-less Safety Gun is designed for use under-water only. Extreme care should be taken to avoid rear-facing balance jets when testing the equipment above water.
  • Page 37: Tube Cleaning

    Flowplant Century Pump Manual 3.2.6 Tube Cleaning Where tube cleaning is to be done by means of a lance, the charge hand who operates the remote control valve should first insert the lance into the tube, leaving the other end of the lance supported by one man.
  • Page 38: Protective Equipment

    Flowplant Century Pump Manual 3.2.10 Protective Equipment A range of top quality protective equipment is available from Flowplant Group Ltd, as follows: PART NO. DESCRIPTION 061037 Waterproof Coverall Suit - size small 061025 Waterproof Coverall Suit - size medium 061026...
  • Page 39: General Operating Instructions

    Flowplant Century Pump Manual 3.3 GENERAL OPERATING INSTRUCTIONS 3.3.1 Introduction The following operating instructions are of a general nature with reference being made to the appropriate manufacturer's handbook for the machine. 3.3.2 Starting To start the unit, carry out the following instructions: i.
  • Page 40: To Oil Bleed The Pump

    Flowplant Century Pump Manual vi. Refer to the manufacturer's handbook for information concerning engine/ electric motor protection/storage. 3.3.4 To Oil Bleed the Pump As delivered from the factory, the pump would have already been oil bled (except pump heads supplied separately). If necessary, oil bleed the pump as follows: Note: Refer to the lubrication chart given in Section 4, Table 4.2 for details of pump oil types...
  • Page 41: To Water Bleed The Pump

    Flowplant Century Pump Manual Fig 3.1 Bleeding the pump 3.3.5 To Water Bleed the Pump CAUTION: ON NO ACCOUNT OPEN THE WATER BLEED SCREWS WHEN THE PUMP IS OPERATING UNDER PRESSURE. Whenever the unit is started after being allowed to run dry, the following procedure must be followed: Set the selector valve to the recycle (dump) position and start the engine/motor.
  • Page 42: To Antifreeze A Unit Without An Antifreeze Tank

    Flowplant Century Pump Manual 3.3.6 To Antifreeze a Unit Without an Antifreeze Tank Prepare 5 gallons (or larger quantity if required) of 30% to 50% anti-freeze solution. Drain the water tanks. iii. Pour the anti-freeze solution into the break tanks.
  • Page 43: To Remove Antifreeze With An Antifreeze Tank

    Flowplant Century Pump Manual Move the selector lever to the high pressure (or on) position. Holding the end of the hose, start the engine. Allow engine to run on tick-over until the anti-freeze solution can be seen coming from the high pressure hose.
  • Page 44: Fault Finding

    Flowplant Century Pump Manual 3.4 FAULT FINDING 3.4.1 General It is essential when fault finding on the pump that due regard is taken of the likely equipment faults. Therefore Table 3.1 includes likely equipment faults, whilst Table 3.2 gives likely pump faults. For details of engine faults refer to the appropriate manufacturer's handbook.
  • Page 45 Flowplant Century Pump Manual Problem Cause Action Low Water Level 1. Blocked or dirty Clean or replace elements. pre-filters. 2. Faulty ball valve Replace if necessary. assembly. 3. Wrong seat in float valve Replace if necessary. assembly. 4. Low inlet pressure.
  • Page 46: Pump Fault Finding

    Flowplant Century Pump Manual Fig 3.2 Pump Fault Finding – Diaphragm Failure and Indication of Other Problems...
  • Page 47: Pump Maintenance And Overhaul Procedures

    Section 4 Pump Maintenance and Overhaul Procedures...
  • Page 48 Mandrel Assembly Inlet Valve Seat – Back Up Ring and ‘O’ Ring Fitting Barrel Code Century Pump – Assembly 65/66 Century Pump – Parts List 4.6a/b Century Pump – Barrel Assemblies 69/70 Safety Valve Assembly Selector Assembly Tables Table Page...
  • Page 49: Routine Maintenance

    Flowplant Century Pump Manual 4.1 ROUTINE MAINTENANCE 4.1.1 Introduction The Maintenance Schedule (Table 4.1) gives details of pump maintenance only. For details of equipment maintenance, refer to the appropriate handbook. Details of pump oil capacities and recommended oil types are given in the Lubrication Chart (Table 4.2).
  • Page 50: Pump Lubrication Chart

    Flowplant Century Pump Manual TABLE 4.2 PUMP LUBRICATION CHART Manufacturer Type Oil Capacity (litres) ESSO Nuto H150 Number of Cylinders GULF LP 150 4-cyl 8-cyl MOBIL DTE Extra Heavy 13.0 11.0 Kiron 150 TEXACO Rando HD 150 Energol HLP 150...
  • Page 51: Pump Service Information

    Flowplant Century Pump Manual 4.2 PUMP SERVICE INFORMATION 4.2.1 General The following paragraphs give details of recommended service tools, torque settings, and service kits to be used when carrying out pump overhaul procedures. 4.2.2 Recommended Service Tools The following tools should be available when servicing the pump: Description Part No.
  • Page 52: Torque Settings

    *Refer to 4.3.1 and the drawings in this section to locate Item Number. 4.2.4 Service Kits Service/overhaul kits are available when carrying out repair or overhaul of the pump. Details of kits for the Century type pumps/accessories are as follows: Description Part No.
  • Page 53: Pump Overhaul Procedures

    Flowplant Century Pump Manual 4.3 PUMP OVERHALL PROCEDURES 4.3.1 Introduction During the pump overhaul procedures, reference should be made to the pump component and assembly drawings (Figs 4.1 to 4.6), which include associated parts lists, Also included are assembly drawings of the Mk 2 selector and safety relief valve (Figs 4.7 and 4.8).
  • Page 54: Removal And Inspection Of Delivery Valves - 4 Cylinder Pumps

    Flowplant Century Pump Manual xiii. Replace the pump, generally reversing the removal procedure. Note: before operating the pump, it may be necessary to bleed the pump of air. xiv. If the pump fitted is new or has been overhauled, carry out the running in procedure detailed from 4.3.7.
  • Page 55: Removal And Inspection Of Delivery Valves - 8 Cylinder Pumps

    Flowplant Century Pump Manual 4.3.4 Removal and Inspection of Delivery Valves – 8 Cylinder Pumps Notes: Oil need not be drained. Refer to 4.3.1 for drawing information. Carry out removal and inspection of Delivery Valves, as follows: Unscrew and remove the Banjo Bolts (57 and 58) with Bonded Seal (65).
  • Page 56: Removal And Inspection Of Delivery Valves - 4 Cylinder Pumps

    Flowplant Century Pump Manual 4.3.5 Removal and Inspection of Delivery Valves – 8 Cylinder Pumps with Split Delivery Manifold Notes: Oil need not be drained. Refer to 4.3.1 for drawing information. Carry out removal and inspection of Delivery Valves, as follows: Unscrew and remove the four Nuts (106 - not shown on drawings).
  • Page 57: Removal And Inspection Of Inlet Valve Assembly And Diaphragm

    Flowplant Century Pump Manual 4.3.6 Removal and Inspection of Inlet Valve Assembly and Diaphragm Notes: It is reccomended that oil is drained from the pump before commencing the following procedure. Refer to 4.3.1 for drawing information. The initial dismantling procedure depends upon the type of pump, as follows: If 4-cylinder pump, carry out the procedure detailed in 4.3.3, i to iv.
  • Page 58: Mandrel Assembly

    Flowplant Century Pump Manual c. Hold end of tap in a vice and gently tap the face of Mandrel (116) with a nylon mallet, until the Bush is removed. d. Carefully press a new Bush into the Mandrel using a drift (part no 201-044).
  • Page 59: Inlet Valve Seat - Back Up Ring And 'O' Ring Fitting

    Flowplant Century Pump Manual c. Fit '0' ring part of Seal into the groove of the Mandrel. d. Push the hard plastic part of Seal over the Dolly, using Pusher (part no 201-065), and locate it in the groove on top of the '0' ring part of the Seal.
  • Page 60: Separating Crankcase Halves

    To inspect/overhaul components within the Crankcase, the two halves of the Crankcase have to be separated. Although this operation can be achieved on the power unit, it is recommended that the pump is removed from the unit and placed in a Century Pump Stand (part no 100-279).
  • Page 61 Flowplant Century Pump Manual c. If unit contains an 8-cylinder pump with split delivery manifold, carry out the procedure detailed in 4.3.5 I to vi. Unscrew and remove Nuts (105). xii. Pull Inlet Manifold (16) off of Studs (101). Note: Depending on the nature of the repair or investigation, either complete the appropriate operation for the pump detailed in 4.3.3, .4 or .5, or continue this procedure...
  • Page 62: Renewing Crankcase Components

    Flowplant Century Pump Manual 4.3.8 Renewing Crankcase Components Once the crankcase has been opened (Para 16) the following major repairs/replacements can be carried out: a) Change Float Bearing (13) – 4.3.8.1 b) Change Bearing (12) – 4.3.8.2 c) Change Cylinder (25), Piston (26) and Slipper (27) – 4.3.8.3 d) Change Bearing (11) –...
  • Page 63 Flowplant Century Pump Manual 4.3.8.2 Change Bearing (12) Unscrew and remove the Shaft Bolt (92) and Washer (88). Slide Sleeve (7) off the Shaft (17). iii. Remove Disc Springs (59), noting which way they were stacked and the quantity. Using circlip pliers, remove Circlip (54) from the groove in Bearing (11).
  • Page 64 Flowplant Century Pump Manual 4.3.8.3 Change Cylinder (25), Piston (26) and Slipper (27) Unscrew and remove Screw (100). Plug (39) may come out with the Screw or when the Cylinder is removed. Unscrew and remove the Cylinder (25). Note: Although the previous operation is all that is necessary to change a Cylinder, it is well worth removing the Spring (35) and the Diaphragm Protection Valve (33) and cleaning them thoroughly.
  • Page 65: Re-Assemble Pump

    Flowplant Century Pump Manual 4.3.9 Re-Assemble Pump After carrying out any repair/replacement procedures, re-assemble the pump as follows: Place the Shaft (17) into the repair stand, ensuring that '0' ring (72) is fitted, and in good condition. Assemble Delivery Crankcase (3) with Oil Seal (81) and Carrier (10), and with '0' ring (71) fitted so that the inner race of the Bearing (12) is supported.
  • Page 66 Flowplant Century Pump Manual Continue replacing the Barrels in an alphabetical and clockwise order. Place Retaining Ring (28) over Bearing and Slippers. Fit Circlip (54) into Bearing groove. Screw retaining Screw (95), with Bonded Seal (64), through Crankcase into the Barrel, leaving about one turn loose.
  • Page 67: Pump Running In

    Flowplant Century Pump Manual xxvii. First push the Counter Balance on to the Shaft, then push the Coupling on to the Shaft. xxviii. Fit Drive Cap (56) into the end of the Coupling, locating Pin (110) into the hole in the Shaft.
  • Page 68: Century Pump - Assembly

    Fig. 4.4 - Century pump Assembly...
  • Page 70: Century Pump - Parts List

    043-110 043-110 IDENTIFICATION ST/ST MANIFOLD SCREW SOCKET 100-234 100-234 DRIVE CAP 013-067 NONE 100-456 100-456 INLET HD.M8x10 SHAFT CENTURY 100-655 100-655 100-333 100-333 BANJO BOLT 100-465 100-465 STUD MANIFOLD OIL CIRCULATION SCREW SET CAP TUBE DELIVERY 100-176 100-333 BANJO BOLT...
  • Page 71 FLOWPLANT GROUP LTD. L E A D E R S I N C L E A N I N G T E C H N O L O G Y Flowplant Group Ltd. Watt Road, Churchfields, Salisbury, Wiltshire. SP2 7UD England.
  • Page 72: A/B Century Pump - Barrel Assemblies

    013256 O RING BS020/90 013279 O - RING 013257 BACK UP RING 015043 GLYDRING 100497 BARREL Mk 4 CENTURY 100675 STOP INLET VALVE 100348 PIN SPIRAL TYPE 5/65" OD 5/8" LG 100672 MANDREL ISSUE HEAT TREATMENT TOLERANCES TO BE AS SPECIFIED BELOW UNLESS OTHERWISE STATED...
  • Page 73 DOWTY SEAL 3/8" 100186 DIAPHRAGM 100316 BANJO DELIVERY BLOCK 3 PORT 100333 BOLT DELIVERY BANJO 100348 PIN SPIRAL TYPE 5/65" OD 5/8" LG 100497 BARREL Mk 4 CENTURY 100498 COLLAR 100499 NUT INLET 100672 MANDREL 037107 SPRING INLET 100674 VALVE INLET...
  • Page 74: Safety Valve Assembly

    * FINE MACHINING * MEDIUM MACHINING FABRICATION L E A D E R S I N C L E A N I N G T E C H N O L O G Y UNMACHINED Flowplant Manufacturing Ltd. Gemini House, Brunel Road, Churchfields, Salisbury, Wilts. SP2 7PU England.
  • Page 75 Parts list 035221 – Safety Valve 2 Assembly Item No. Part No. Description 013069 WASHER S/COIL SQR.SECTION M6 SPRING STEEL ZN 013525 SCREW SET SOCKET CAP HD M 6-1.0 6G 35 LG HT 8.8 ZN 015013 O RING BS013 PTFE 015014 SEAL GLYD RING 15MM DIA SHAFT 015033...
  • Page 76: Selector Assembly

    THREADS: BSP, TO MED. FIT. B.S. 2779 HOLE CENTRES TO BE COPYRIGHT 2004 Flowplant Group Ltd. Tel: (01722) 325424 Fax: 01722 411329 AREA ISOMETRIC TO 6g / 6H REMOVE ALL BURRS & SHARP EDGES. Fig. 4.8 - Selector Mk2 - Century...
  • Page 77: Warranty

    Section 5 Warranty...
  • Page 78: Section Page

    Section 5 Warranty Contents Section Page 5.1 Flowplant Warranty 5.2 Limited Warranty Policy 5.2.1 Non Warranty Items 5.2.2 Service and Spares...
  • Page 79 Flowplant Century Pump Manual 5.1 FLOWPLANT WARRANTY Warranty of new products: Equipment manufactured and supplied by Flowplant is warranted to be free from defects in materials and workmanship. The warranty includes both parts and labour necessary to correct any such defects.
  • Page 80 Flowplant Century Pump Manual 5.2 LIMITATIONS OF THE WARRANTY The new product and spare parts warranty is limited to defects in material or workmanship of the product. It does not cover loss of time, inconvenience, property damage or any consequential damages. Repair or replacement of the product is your exclusive remedy.
  • Page 81 Flowplant Century Pump Manual Brakes (Trailer)  Brake shoe adjustment/bleeding and topping up of reservoir/draining of air systems where not due to a defective part.  Brake squeal from brake linings.  Replacement of linings due to fair wear and tear.
  • Page 82 Flowplant Century Pump Manual General (all products)  Fair wear and tear.  Any work carried out to improve the general finish of the machine above  what is known to be the factory standard.  Failure to maintain the equipment in accordance with the manufacturers reccomendations.
  • Page 83 Flowplant Century Pump Manual 5.2.2 Service and Spares Flowplant provide service and spares cover in most parts of the world. When ordering spares, please quote:- a) Your company name and address. b) Destination of parts, if different. c) Description and part number.

Table of Contents