BASF inge dizzer XL Series Assembly Instructions Manual page 34

Modules for open platform
Table of Contents

Advertisement

Step
Activity
Installing the intermediate piece PP 2" length 94 mm on connection points
4
Position the intermediate piece PP 2" length 94 mm on the
a)
module's connector.
b)
Pull the gasket ring from the connector over the intermediate
piece PP 2" length 94 mm so far that it is placed in the middle
between the grooves of both parts.
Place a flexible coupling 2" halfshell around the gasket.
c)
Ensure that the contact surfaces of the coupling halfshells
are resting in the provided grooves.
Place the second flexible coupling 2" halfshell on the first and
d)
insert the bolts in the openings.
Tighten the flexible coupling 2" with two nuts M10 and washers
e)
using an open-end or box wrench (size 17) until the contact
surfaces of both coupling halves are flush and resting against
each other without a gap.
Ensure that the nuts are tightened evenly and alternately.
f)
Repeat steps a) to e) for all three connections of the module.
dizzer® XL Series Modules for Open Platform – Assembly Instructions 1.1(2019-01) E inge
© inge GmbH
Installation / Assembly
Figure
Page 34 of 44