11. Peg out all the remaining pegging
points and guy lines starting from the
corner against the vehicle and work
round the awning.
13. Finally, slot the adjustable steel pole
in to the black pockets in the roof of the
awning. Adjust to tighten the roof.
Visit the website for Video Instructions
Warning: Never unzip the zips on the protective
sleeves whilst the AirFrame Tubes are inflated. This
may result in the tube bursting or ballooning out of the
sleeve - causing damage to the tube and the sleeve.
12. Peg out the Reflective Endurance
Storm Straps for extra stability. Please
make sure in heavier weather you use all
the guy lines and storm straps to hold
the awning in place.
6
Packing away your awning.
Zip up all the windows and doors before deflating.
Unpeg the guy lines, storm straps and most of the pegs around the
awning - leaving the four corners pegged out.
Open each of the Dynamic Speed Valves in turn and press in the quick
release button. Leave the button pressed in.
Unpeg the four corners and pull the awning out of the awning channel.
Lay the awning flat on the ground.
Measure the width of the bag
up against the width of the fold-
ed awning to make sure the
awning is going to fit.
Place the rolled awning on to
the bag and pull the sides up
round it. Finally, Zip up the bag.
Fold the awning lengthways to
make a long thin straight line.
Begin to roll the awning as tight
as possible from the opposite
end of the Valves to expel all
the air as you roll.
7
Need help?
Do you have a question about the Movelite 2 and is the answer not in the manual?
Questions and answers