General Site Requirements; Site Environment; Preventive Site Configuration; Site Log - Cisco CRM3 Hardware Installation And Maintenance

Table of Contents

Advertisement

Genera
Site
Requrements
This section
system
your
Environment
Site
The
location
extremely
ventilation
system
When
equipment
currently experiencing
precautions
Preventive
Site
Configuration
The
following
and
will
Remember
adequate
Ensure
Always
discharge
If
configured
processor
designed
in turn
CheckUst
nstaUaton
The
Installation
new
systems
of the checklist
describes
the requirements
Ensure
that
site
your
is
and
of individual
chassis
for
important
proper
system
and
inaccessible
panels
maintenance
difficult

and equipment

site
planning
layout
your
and
reduce
likelihood
failures
the
shutdowns
or unusually
isolate
may
help
you
the
will
precautions
help
avoid
to
help
environmentally
that
electrical
equipment
cool
equipment
to
to
acceptable
which
room
that
the
in
your system
follow
ESD-prevention
immediate
can
cause
two network
with
fewer
than
module
slot
filler
panel
allow
air to
to
cooling
and
redirect
the
interrupt
Checklist
see
Figure
Make
of
checklist
this
copy
each
for
in
system
must meet
site
for
your
before
properly
prepared
beginning
the layout
of
equipment
your
Equipment
operation
placed
malfunctions
can
cause
system
use the following
locations
of environmentally
with
high
errors
cause
of
and
failures
prevent
you
plan an
acceptable
operating
caused
failures
equipment
Ambient
heat
generates
operating
temperatures
has adequate
operates
avoid
damage
to
procedures
failure
oi
intermittent
equipment
modules
processor
in the
slot
to
permit
open
propel
An
flow
within
access
open
internal
flow
of cooling
across
air
the procedures
2-1
lists
all
when
and
note
each
procedure
Site
Log See
Site
the
your
General
Site
and
safe
installation
operation
installation
rack
room
or wiring
are
too close together
inadequate
and shutdowns
make
and
can
help avoid
precautions
to
shutdowns
caused
If
you
are
these
equipment
existing
your
future
problems
environment
router
for
your
room
not be
may
temperature
without
circulation
adequate
circulation
from
Damage
equipment
to
must
network
place
you
flow The
chassis
air
is
which
allows
air
leaks
panel
components
hardware
for
initial
installation
Place
completed
is
Log
section
for Installation
Preparing
Requirements
of
static
may
of
copy
2-3

Advertisement

Table of Contents
loading

Table of Contents