Technical Description; Installation And Servicing Instructions; Device Continuity Maintenance And Installation Test - natus UltraPro S100 User Manual

Hide thumbs Also See for UltraPro S100:
Table of Contents

Advertisement

Technical description

Installation and servicing instructions

Device continuity
maintenance and
installation test
September 13, 2018
Your UltraPro S100 allows you to perform a wide range of Nerve Conduction
Studies (NCS), Electromyography (EMG), and Autonomic Studies. Separate
software programs and optional accessories let you customize your UltraPro
S100 to meet your specific clinical needs.
During installation, assembly and operation, some protective
ground connection points are susceptible to becoming electrically detached
or not properly connected. This can pose a safety hazard to both the user
and patient.
It is recommended/required that you perform regular electrical continuity
tests from exposed conductive materials on the medical system to the
protective ground on the medical system. Regular testing will help ensure
that proper protective grounding is maintained. This test should always be
performed after installation and maintenance. Additionally, this test should
be performed on a regular maintenance basis.
Introduction
1-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents