NEOxl 80 6U Tape Library Base Module
Quick Start Guide
*10400897*
This document describes how to install a NEOxl 80 6U Tape
Library Base Module. Expansion Modules can be added to
the Base Module to enhance the system.
Step 1
It is essential that you activate your warranty. Technical
and warranty support are not available until the warranty
is active.
The serial number is located at the rear of the module on the
bottom left cover.
Module Registration
For an existing customer:
1. Go to
http://support.overlandstorage.com/
2. Enter your e-mail
address and password
in the appropriate fields,
and then press Enter or
click the right arrow (
3. At the Support Home page, click Register New.
4. Enter the requested information and click Submit.
Your warranty certificate will be emailed to you. Follow
the instructions in the email to complete the process.
For a new customer:
1. Go to the
New User Registration
instructions.
2. You'll receive a confirmation e-mail from Overland with
instructions on how to complete the process.
10400897
10400897
support page.
>
).
page and follow the
Step 2
WARNING: Due to the weight of the module, it is
recommended that at least two people be used to lift the
module out of the box to prevent injury.
WARNUNG: Um Verletzungen zu vermeiden, empfehlen
wir aufgrund des Gewichts des Moduls, dass mindestens
zwei Personen das Modul aus der Verpackung heben.
AVERTISSEMENT: En raison du poids du module, il est
recommande d'utiliser deux personnes au moins pour
soulever l'module hors de la boîte pour éviter les
blessures.
NOTE: If the temperature in the room where the module will be
installed varies by 15º C (30º F) from the room where the boxed
module was stored, allow it to acclimate to the surrounding
environment for at least 12 hours before unpacking it.
1. Using two people, remove the module from its box and
set it on a secure surface.
2. Remove and save the packaging materials and tape
from the Base Module.
Step 3
A NEOxl 80 6U Base Module comes with a rack kit for easy
installation and securing of the module into a 19-inch
(EIA-310) rack.
IMPORTANT: Two-post telco-style or other racks less than
29 inches in depth will NOT support these modules.
Install the Rack Rails
1. Determine the location in your rack for your Base
Module to be installed and, using a pencil, mark the
location on each vertical rail in your rack.
©2019 Overland-Tandberg
6U (10.5 in.)
Each EIA unit (1U) starts at a
&
narrow gap and has three holes
and two wide gaps above it
Wide Gaps within the EIA unit
Narrow Gaps between EIA units
Page 1 of 4
Need help?
Do you have a question about the NEOxl 80 and is the answer not in the manual?
Questions and answers