Page 2
Ironing Center Parts List Tools needed: Phillips head screwdriver. Assembly time: Approx. 40 min. 24” x 22” 17½” x 22” 17½” x 22” 33¼” x 20¼” 33¼” x 20¾” 33¼” x 20¼” 20¾” x 19” 22½” x 20¾” 33¼” x 11” 33¼”...
Page 3
Ironing Center Instructions 1. Place Boards A, B and C face down as shown below and screw hinges (9) using screws (1); attach plastic clamp (12) into boards B and C as shown using screws (11). Using screws (1) attach hinges (6) to left and right door panels I and J and to boards D and F.
Page 4
To clean use a cloth or sponge and some mild detergent. DO NOT USE any abrasive pads or cleaners. DO NOT RETURN TO STORE Sullivans will replace any missing manufacturing or defective parts within 30 days of purchase. Send a dated receipt copy to (630) 435-1532 (Fax) or Sulnotions@sbcglobal.net THIS POLICY DOES NOT APPLY TO SHIPPING DAMAGES.
Page 5
DO NOT RETURN TO THE STORE FOR ASSISTANCE WITH MISSING OR REPLACEMENT PARTS, INSTALLATION, OR INFORMATION PLEASE CALL US AT 800.862.8586 www.sullivansusa.net www.sullivansusa.net 4341 MIDDAUGH AVENUE • DOWNERS GROVE, IL 60515 • ORDERS: 800.862.8586 • FAX: 630.435.1532...
Need help?
Do you have a question about the 39282 and is the answer not in the manual?
Questions and answers