Grainger 2XZG3 Operating Instructions & Parts Manual

Folding gate

Advertisement

Locking
Bar (D)
Gate (A&B)
Fixing bar (E)
7.
Tighten the bolts to secure
Figure 3
bar (D), and insert a padlock. (See Figure 1)
8.
Repeat step 3 to 8. Mount another side of the locking bar (D).
9.
Pull two door (A&B) together,Assemble them with bolts and nuts.
2XZG3
Manufactured for Grainger International, Inc. Lake Forest, IL 60045
OPERATING INSTRUCTIONS & PARTS MANUAL (OIPM)
Folding Gate (2XZG3/2XZG4*)
Left Gate Assembly
(A)
Caster Base (C)
Figure 2
holes, use with lead anchors.
5.
Drill appropriate holes and insert the appropriate bolts.
6.
Mount the
Locking Bar
Open Position
Caster Base (C)
Figure 1
1.
Insert the caster base (C) into the gate
(A&B). (See Figure 2)
2.
Stand folded gate against the door frame
where you intend to mount it. (See Figure
1)
3.
Mark though the mounting holes of the
locking bar (D) with a pen or pencil.
4.
For mounting into:
Wood: use 5/16" × 2" Lag Bolts.
Steel: drill and tap for 5/16" × 1" Bolts.
Brick or concrete: use 5/16" × 2" Lag Bolts Drill 3/8"
(D) by inserting the bolts.
Locking Bar
(D). (See Figure 1) Pull the door (A) into the locking
Right Gate Assembly
(B)
Locking
Bar (D)
CASTER

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 2XZG3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Grainger 2XZG3

  • Page 1 (D), and insert a padlock. (See Figure 1) Repeat step 3 to 8. Mount another side of the locking bar (D). Pull two door (A&B) together,Assemble them with bolts and nuts. 2XZG3 Manufactured for Grainger International, Inc. Lake Forest, IL 60045...
  • Page 2 2 pcs. Locking Bar MHLB001 PARTS 2XZG4 is a 6 Ft gate and can be used as an extension to a 2XZG3 NOTE: Product images are shown for display purposes only and may not be representative of the final product.

This manual is also suitable for:

2xzg4

Table of Contents