Assembly - Samsung GT-N7100 Service Manual

Gsm telephone
Hide thumbs Also See for GT-N7100:
Table of Contents

Advertisement

7-2. Assembly

1) Assemble Front with PBA.
2) Assemble screw 1point on PBA.(Torque:1.0 ~
1.2 Kgf ㆍ Cm )
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
Distribution, transmission, or infringement of any content or data from this document without Samsung's written authorization is strictly prohibited.
1
3
1) Assemble Digitizer, SUB PBA, 1.9M CAMERA,
LCD FPCB, Earjack, Power key connector.
2) Assemble coaxial cable.
1) Assemble Front with Rear.
2) Assemble screw 11Point on Rear.(Torque:1.0
~ 1.2 Kgf ㆍ Cm )
7-3
7. Level 2 Repair
2
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents