Download Print this page

SafeShore HydroSweep Pro Installation And Operating Instrucitons page 3

Advertisement

Cord Hole
Shaft
7
*Shown   w ith   u niversal   d ock   m ount.   D ock   m ounts   w ill   v ary.*
Pump tube
5
1
2
6
Collar
12"
1. Take   b ail   a nd   a Zach   t o   p ump  
with   t he   h ardware   p rovided   i n  
the   b ail   p ackaging.   ( Cord   h ole  
up)    
2. The   c arriage   b olt   s pacer   s hould  
be   i nstalled   b etween   t he  
carriage   b olt   a nd   t he   i nside   o f  
the   p ump   t ube.   ( Figure   2 )     T he  
3/8"   b olts   g o   t owards   t he   p rop  
and   t he   1 /2"   b olts   t owards   t he  
back.
3
4
3. AZach   t he   s hah   t o   t he   b ail   u sing  
the   p rovided   3 /8"   x   2   1 /4"  
stainless   s teel   b olt   a nd   b rass  
nylock   n ut.  
4. Take   s hah   c ap   o ff   a nd   s lide   g ear  
motor   o n   s hah   a nd   I ghten  
collar   w ith   t he   t humb   n ut;   p ut  
shah   c ap   b ack   o n.  
  * Note*   O nce   m ounted   o n   d ock,  
adjust   u nit   1 2"   o ff   t he   fl oor   o f   t he  
waterfront,   p ointed   s lightly   u p,   a nd  
Ighten   c ollar.   T he   c ollar   m ust   s lide  
into   t he   n otches   o n   t he   g ear   m otor.  
(Figure   4 )
5. Install   d ock   m ount   t o   d ock   a nd  
ensure   b olts   a re   I ghtened  
securely.    
6. Slide   a ssembled   u nit   o n   t he  
dock   m ount   a nd   I ghten   t he  
posiIon   l ocking   b olt.  

Advertisement

loading