bemodern PRYZM 5D 1000L Instructions For Installation Manual

Chimney breast

Advertisement

Quick Links

Camino- Chimney Breast
Plinth/ No Plinth Options
Instructions for installation
Patent pending
UK Registered Design
R1 Aug 2019
1
200789_1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PRYZM 5D 1000L and is the answer not in the manual?

Questions and answers

Summary of Contents for bemodern PRYZM 5D 1000L

  • Page 1 Camino- Chimney Breast Plinth/ No Plinth Options Instructions for installation Patent pending UK Registered Design R1 Aug 2019 200789_1...
  • Page 2: Table Of Contents

    Contents Technical Specification What is in the Boxes 4 – 5 Installation- Introduction Installation- Including Optional Plinth Installation- Excluding Optional Plinth Assembly- Hanging System Assembly- Decorative Panel 9-11 Assembly- Framework 12-13 Assembly- Hearth Assembly- Hearth & Framework Installation- Fixing To The Wall 15-16 Installation- Fixing The Fire Installation- Fitting The Decorative Panels...
  • Page 3: Technical Specification

    Fire Description Logs 53” CAMINO Timber CHIMNEY BREAST Wall mounted: 4 LRG 1220mm 2009mm 290mm 1350mm 212mm PRYZM 5D 1000L Excluding Plinth Timber 53” CAMINO Floor standing: CHIMNEY BREAST Including 4 LRG 1220mm 2253mm 290mm 1350mm 212mm PRYZM 5D 1000L...
  • Page 4: What Is In The Boxes

    What Is In The Boxes? Box- 024287 1000L PRYZM Fire Engine x 1, Logs x 4, Fire Remote x1 Box -031658 Optional Plinth x 1 Box- 029920 Component “A” Wall Fixing Panel x 1 Component “B” Light Bleed Cover x 1 Component “C”...
  • Page 5: Installation- Introduction

    Screws Please ensure all fixings are present before commencing installation. If anything is missing please call Customer Services on 01914300901 or email us at customerservices@bemodern.co.uk Installation – Introduction Note: The chimney breast is a two adult person lift. A second person will be required to lift and support the chimney breast during installation.
  • Page 6: Installation- Including Optional Plinth

    Installation – Including Optional Plinth Minimum Ceiling Height Required- 2300mm (As shown on Page 3) If fixing into a stud wall, locate the studs and consider positioning the Wall Fixing Panel over as many studs as possible. Minimum of 2 studs recommended, as well as the 13 additional fixings points ,as detailed in Diagram 1.
  • Page 7: Installation- Excluding Optional Plinth

    Installation – Excluding Optional Plinth Minimum Ceiling Height Required- 2160mm (As shown on Page 3) If fixing into a stud wall, locate the studs and consider positioning the Wall Fixing Panel over as many studs as possible. Minimum of 2 studs recommended, as well as the 13 additional fixings points ,as detailed in Diagram 2.
  • Page 8: Assembly- Hanging System

    Assembly –Hanging System Once the Wall Fixing Panel- Component “A” has been secured to the wall, the next step is the fitting of the fire mounting brackets -Box 029882. The Wall Fixing Panel comes with pre drilled holes so the brackets can be attached in the correct position.
  • Page 9: Assembly- Decorative Panel

    Assembly –Decorative Panel Note: Before laying the panels down onto a flat surface, make sure the surface is clear of sharp objects and other debris that may damage the decorative surface. Consider using the surplus cardboard packaging to help protect the decorative surface- as shown in Diagram 6. Locate Component “C”-Box 029920 and position this panel face down.
  • Page 10 Assembly –Decorative Panel Continued… Push both Components “D” and “E” into Component “C” ensuring the back surfaces are level and the ends are flush as shown in Diagram 8. Once in position, lock together by turning the cams ½ turn clockwise, this will lock the pins into the cams, as shown in Diagram 9. Diagram 8 X 10 Diagram 9...
  • Page 11 Assembly –Decorative Panel Continued… Components “F” and “G” – Box 029920 , can now be fitted across the rear of the assembled components, as shown in Diagram 11. Firstly insert the dowels into Components “D” and “E”, two per panel, the holes have been pre-drilled.
  • Page 12: Assembly- Framework

    Assembly –Framework Note: Once again consider using the surplus cardboard packaging to help protect the painted surfaces. Locate Box_029890 - Components “J” and “K” have been pre-assembled. Locate Box- 029882 - Components “L”, “M” and “N”. The dowels and pins have been pre-installed on Components “L” and “N” and the Cams have been pre-installed on Components “J”, “K”...
  • Page 13: Assembly- Hearth

    Assembly –Framework Continued… The final step is to fasten Components “L”, “M” and “N” into position by turning the 6 x cams clockwise ½ a turn, as shown in Diagram 17. The framework is now complete, store safely to one side for later use. Diagram 17 Note: Ensure all cams have locked onto the pins correctly and the framework is secure, before attempting to move.
  • Page 14: Assembly- Hearth & Framework

    Assembly –Hearth and Framework Note: The chimney breast is a two adult person lift. A second person will be required to lift and support the chimney breast during installation. Ensuring that the pre-installed Cams at the bottom of the framework point to the bottom edge, as shown in Diagram 20, carefully position the assembled framework onto Component “P”, ensure the framework is positioned correctly prior to locking the cams onto the pins, as shown in Diagram 19.
  • Page 15: Installation- Fixing To The Wall

    Installation- Fixing To The Wall IMPORTANT NOTE: Wall fixings (i.e. screws/wall plugs etc.) are not supplied as these are crucially dependent upon the type of wall and surface the chimney breast is going to be fixed too. The installer is therefore responsible for ensuring that suitable fittings are used as well as individual fitting situations and environments.
  • Page 16 Installation- Fixing To The Wall Continued… Once the holes have been drilled and the wall behind marked, remove the assembled chimney breast from the fire mounting brackets so that the fire can be positioned. Prior to positioning the fire it may be necessary to plug the drilled holes, depending on the wall medium. Carefully unpack the fire- Box 024287 and store the logs and remote safely for later use.
  • Page 17: Installation- Fixing The Fire

    Installation- Fixing The Fire Once the chimney breast is secured to the wall and brackets, the fire now needs to be secured, this is done by lifting the fire upwards and pulling forward so that the 4 x keyhole slots on the fire locate onto the pre-installed screw heads on the rear of the chimney breast front, once over the screw heads the fire can be lowered in place, as shown in Diagram 25.
  • Page 18: Installation- Fitting The Decorative Panels

    Installation- Fitting The Decorative Panels The final part of the installation is to hang the previously assembled decorative panels onto the installed framework. Note: This is a two adult person lift to avoid injury or damage. Offer the assembled panels up to the framework, ensuring the locating clips engage over the 4 X cut outs in Components “K”...
  • Page 19: Maintenance / Troubleshooting

    Avoid using cleaners or polishes that contain abrasives, solvents, acid and ammonia. Troubleshooting Should you have any queries regarding this product please contact Customer Services on 01914300901 or email us at customerservices@bemodern.co.uk Recycling All cardboard packing is recyclable. 200789_1...

Table of Contents