Arfit PLUG EC Instruction Manual

Ventilation box

Advertisement

Ventilation Box
Instructions Manual
www.arfit.pt
Quality Management System certified according to the Norm ISO 9001:2008 by TÜV Rheinland Portugal.
R. Domingos Ferreira da Costa nº 280 - Z.I. da Maia I, Sector VIII 4475-297 Gemunde Maia
T 223 797 631 F 223 720 231 E info@arfit.pt

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PLUG EC and is the answer not in the manual?

Questions and answers

Summary of Contents for Arfit PLUG EC

  • Page 1 Quality Management System certified according to the Norm ISO 9001:2008 by TÜV Rheinland Portugal. R. Domingos Ferreira da Costa nº 280 - Z.I. da Maia I, Sector VIII 4475-297 Gemunde Maia T 223 797 631 F 223 720 231 E info@arfit.pt...
  • Page 2 ASSEMBLY Like any equipment, PLUG EC ventilation box units must be installed correctly and maintained in order to guarantee their proper functioning throughout the equipment's life cycle. The following recommendations should be followed if they are valid to the equipment acquired.
  • Page 3 MAINTENENCE CE DECLARATION OF CONFORMITY Air purification equipment need to be maintained periodically in order to perform their function correctly. The time in which such maintenance should be performed depends on the environment in which the equipment is inserted as well as the hours of operation. Thus, what is indicated below are mere guidelines.
  • Page 4 EQUIPMENT WARRANTY TROUBLESHOOTING ARFIT offers a 2 (TWO) year warranty period against all manufacturing defects starting after the product is bought. Technical assistance during the warranty period will only be provided if a purchasing document proving that the equipment is still under a warranty period is shown.