SCHOTTEL SRP Series Operating Instructions Manual

SCHOTTEL SRP Series Operating Instructions Manual

Rudder propeller

Advertisement

SCHOTTEL
Section
1
1.1
1.2
Fig. 1
1.3
1.4
1.5
2
2.1
or Repaired SRP
2.2
2.3
2.4
3
3.1
3.2
3.3
3.4
3.5
SRP out of Operation for up to 6 Months
3.6
3.7
3.8
4
4.1
4.2
4.3
Dat.
1-12-77
SRP 15 .... SRP 300
SCHOTTEL - RUDDER PROPELLER
OPERATING INSTRUCTIONS
Cross-sectional View
TD-NM-in
"SRP"
No.
BA 103 E
Page
2
2
2
3
4
4
4
6
6
6
7
8
8
8
8
10
10
12
12
12
14
14
14
14
14
16
19
Seitenz.
Seite
19
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SRP Series and is the answer not in the manual?

Questions and answers

Summary of Contents for SCHOTTEL SRP Series

  • Page 1: Table Of Contents

    SCHOTTEL SRP 15 ..SRP 300 BA 103 E SCHOTTEL - RUDDER PROPELLER "SRP" OPERATING INSTRUCTIONS Section Page DESCRIPTION General Design Fig. 1 Cross-sectional View Lubrication Compensating Fin Steering Worm Gears OPERATION Measures to be taken when Operating a New...
  • Page 2: Description

    SRP 15 ..SRP 300 BA 103 E DESCRIPTION GENERAL The SCHOTTEL rudder propeller, hereafter called SRP, is a Z-drive unit. The lower gearing with the propeller has been designed to be able to infinitely turn to port or starboard,...
  • Page 3 SCHOTTEL SRP 15 ..SRP 300 BA 103 E Figure Cross-sectional View Dat. TD-NM-in Seitenz. Seite 1-12-77...
  • Page 4: Lubrication

    SCHOTTEL SRP 15 ..SRP 300 BA 103 E To avoid air from entering the propeller, a cover plate (Figures 4/2 or 6/2) can be provided. In addition, a nozzle can be provided for increasing the thrust. LUBRICATION The SRP features oil bath lubrication, i.e. it is filled with oil.
  • Page 5 SCHOTTEL SRP 15 ..SRP 300 BA 103 E Figure 2 Steering Worm Gear Design for Navigator Plug screw with dipstick Hydraulic motor Rudder position Worm gear transmitter Magnetic plug (oil drain plug) Second oil drain plug Design for Well Installation...
  • Page 6: Operation

    SCHOTTEL SRP 15 ..SRP 300 BA 103 E OPERATION MEASURES TO BE TAKEN WHEN OPERATING A NEW OR REPAIRED SRP The inside of the SRP is preserved after the test stand run. The corrosion preventative lasts for about 6 months when stored in dry ambient air (no sea-water atmosphere).
  • Page 7: Table Of The Oil Quantities

    SCHOTTEL SRP 15 ..SRP 300 BA 103 E Table of Oil Quantities Type SRP 15/30 11,5 10OO 21,5 1100 22,5 1200 23,5 1300 24,5 1400 10,5 16,5 25,5 1500 17,5 26,5 46,5 1600 11,5 18,5 27,5 1700 1800 12,5...
  • Page 8: Checks During Operation

    SCHOTTEL SRP 15 ..SRP 300 BA 103 E CHECKS DURING OPERATION Check the condition of the SRP gear-box lubricating oil; if the oil has a milky colour, water has entered the lower section: Have it repaired. Check the oil level of the SRP.
  • Page 9 SCHOTTEL SRP 15 ..SRP 300 BA 103 E Figure 3 oil suction pump SRP Well Installation Dat. TD-NM-in Seitenz. Seite 1-12-77...
  • Page 10: Srp Gear-Box Oil Change

    SCHOTTEL SRP 15 ..SRP 300 BA 103 E SRP GEAR-BOX OIL CHANGE The oil can be drained by unscrewing the magnetic plug (Figure 1/16) or pumped out from the top; observe the relevant laws for keeping waters clean. Note: When the magnetic plug has been removed, check it for sticking particles.
  • Page 11 SCHOTTEL SRP 15 ..SRP 300 BA 103 E Figure 4 Figure 5 Figure 6 Dat. TD-NM-in Seitenz. Seite 1-12-77...
  • Page 12: Checks On The Lower Gearing

    SCHOTTEL SRP 15 ..SRP 300 BA 103 E CHECKS ON THE LOWER GEARING the ship is hauled up or the SRP swung out or removed, the following checks should be carried out: Check all gaskets on and above the lower gearing (Figures 1/14 and 1/16) for oil leaks, have repaired, if required.
  • Page 13 SCHOTTEL SRP 15 ..SRP 300 BA 103 E Torque Loads for the Mounting Screws of A: Lower Gearing B: Copper plate or nozzle SRP Type Thread size Wrench Torque Size M 10 30/15 M 12 30/31 M 12 50/50...
  • Page 14: Air Filter Cleaning

    After the rudder position indicator has been adjusted, pull out the feeler pin (Figure 7/1) again. INSTALLATION SCHOTTEL NAVIGATOR INSTALLATION If special instructions have to be observed for this installation, refer to the applicable operating instructions of the navigator.
  • Page 15 SCHOTTEL SRP 15 ..SRP 300 BA 103 E Figure 7 Installation of the SRP in the Well Feeler pin 2) Hexagon nut 3) Steering pipe flange 4) Rubber gasket 5) Well foundation 6) Power transmission shaft 7) Worm 8) Connecting sleeve...
  • Page 16: Propeller Installation

    (Figures 8/3 or 9/5) and tighten the nut by means of a wrench hammer (normally, the wrench hammer forms part of the scope of delivery of the SCHOTTEL rudder propeller). When the arrangement is according to Figure 8, pay attention to the tab washer (Figure 8/2).
  • Page 17 SCHOTTEL SRP 15 ..SRP 300 BA 103 E Figure 8 figure 9 Dat. TD-NM-in Seitenz. Seite 1-12-77...
  • Page 18 SCHOTTEL SRP 15 ..SRP 300 BA 103 E Lock the propeller nut according to Figure 8 by forcing the tab washer (Figure 8/2) into the slots of the propeller hub and lock the propeller nut. Lock the propeller nut according to Figure 9 by tightening...
  • Page 19: Recommended Lubricants

    SCHOTTEL SRP 15 ..SRP 300 BA 103 E RECOMMENDED LUBRICANTS Lubricating oil for Lubricating oil for Worm Gearing Brand SRP drive Degol BG 68 (ISO) Degol BG 46O Degol TU 68 (ISO) Energol GR-XP 68 (ISO) Energol GR-XP 460 (ISO)