Installation - Galmet SG Fusion 100 Installation And Operating Manual

Layered tank for dual function gas boilers
Table of Contents

Advertisement

2. Installation

Installation should be done by a specialist with suitable qualifications (connecting the heater should be noted down in the warranty card). Due to the design
of the water heater, it can be installed only VERTICALLY.
The water heater must be connected directly to the water supply network (with the possibility of disconnection in case of maintenance) with a pressure not
exceeding 1 MPa - approx. 10 bar, and the minimum pressure can not be lower than 0,1 MPa - approx. 1 bar. If water pressure in the water supply network
exceeds 1 MPa - approx. 10 bar, it is necessary to reduce the pressure by using a reduction valve.
A safety valve, for example ZB8 FACH Cieszyn, must be installed on the cold water supply pipe, while the safety valve, equipped with a function that reduces
water pressure in the water heater through redirecting its flow back to the water supply installation, with a water supply installation that, for a distance of
5 m from the safety valve, should withstand a water temperature of 90°C (due to the possibility of hot water flow from the tank to the installation).
The outlet of the safety valve must be open all the time – connected with a normal atmosphere.
The tank acts as a buffer loaded from the top with warm water, which does not mix with the cold water occupying the bottom section of the tank. This
solution greatly enhances the comfort of using a dual function boiler, resulting in a large amount of heated water in a short time. A 3-stage circulation
pump (standard) of adjustable output allows the tank to work with dual function boilers of various outputs, without the risk that they will switch off due
to overheating of the water flowing into the tank. Its compact size makes it possible to locate the tank right beneath your boiler, and this means easy and
quick installation even in small spaces.
The outer body of the circulation pump is made of composite. The maximum force
that can be used to screw the pump can not exceed 30 Nm.
To DHW installation
the supply of hot
water increases
© All rights reserved - Galmet Sp. z o.o. Sp. K.
Loading
Dual-function
gas boiler.
Boiler's
exchanger.
1. Layer tank
2. Loading pump
3. Cold water inlet
4. Cold water outlet (to gas boiler)
5. Connector for hot water from gas boiler
6. Domestic hot water outlet
Water intake
Dual-function
gas boiler.
Boiler's
exchanger.
To DHW installation
the supply of hot
water decreases
7. Loading pump's control sensor
8. Water drain
9. Check valve
10. DHW expansion vessel
11. Safety valve
12. 5/4" plug for electrical set
Installation and Operating Manual - SG(S) Fusion
2. Installation
Cold water
5

Advertisement

Table of Contents
loading

Related Products for Galmet SG Fusion 100

This manual is also suitable for:

Sgs fusion 100

Table of Contents