Remove the equipment cover and keep the screws in a dish.
The PCBs will be placed as shown. Input Upgrade PCB left, Output Upgrade PCBs right. The output PCBs come as a
stack of 3 to upgrade 6 channels. The output stack needs 3x 3.5mm holes drilled in the case.