Page 1
Fallnet ® Installation, maintenance and user manual for the Fallnet ASG maintenance guardrail ®...
Page 2
Contents Maintenance guardrail Fallnet ® General assembly, maintenance Page 3 and safety instructions Installation manual Page 4 – 6 Maintenance, storage and Page 7 disposal Assembly User manual and Page 8 manufacturer’s specifications 1.-2. Loosen transport safety device Position the post at the required angle Fix the position of the post 4.-5.
Page 3
• Prior to installation, all parts of the ZinCo Fallnet ASG are guardrail is to be locked until the defect has been dealt with.
Page 4
Draw up the post to 90° and Draw up the post to 67.5° insert the screw. and insert the screw. ZinCo GmbH ∙ Lise-Meitner-Strasse 2 ∙ 72622 Nürtingen ∙ Germany Tel. +49 (0) 7022 6003-0 ∙ Fax +49 (0) 7022 6003-100 E-Mail: info@zinco-greenroof.com ∙ www.zinco-greenroof.com...
Page 6
2.60 m max. 1.65 m Attention! The roof pitch must not exceed 5°! max. 1.65 m ZinCo GmbH ∙ Lise-Meitner-Strasse 2 ∙ 72622 Nürtingen ∙ Germany Tel. +49 (0) 7022 6003-0 ∙ Fax +49 (0) 7022 6003-100 E-Mail: info@zinco-greenroof.com ∙ www.zinco-greenroof.com...
Page 7
Defective or missing components are to be replaced. Loose connections are to be tightened! ZinCo GmbH ∙ Lise-Meitner-Strasse 2 ∙ 72622 Nürtingen ∙ Germany Tel. +49 (0) 7022 6003-0 ∙ Fax +49 (0) 7022 6003-100 E-Mail: info@zinco-greenroof.com ∙ www.zinco-greenroof.com...
Page 8
The client and Manufacturer: (perhaps later on) the owner is also under obligation here and ZinCo GmbH, Type Fallnet ® is responsible for ensuring compliance with all specifications Standard: Collective edge protection system for temporary relating to occupational safety on a roof.