Download Print this page

Advertisement

Quick Links

I N S TA LLA T I O N M A N U AL
O P US T R I O S C A L A
GAS STOVE
FIRED BY DESIGN

Advertisement

loading

Summary of Contents for Opus Trio Scala

  • Page 1 I N S TA LLA T I O N M A N U AL O P US T R I O S C A L A GAS STOVE FIRED BY DESIGN...
  • Page 3 INSTALLATION & SERVICING INSTRUCTIONS (TO BE LEFT WITH THE CUSTOMER) For use in UK & Ireland on Natural Gas (G20) at a supply pressure of 20mbar GB/IE...
  • Page 4 INSTALLATION INSTRUCTIONS CONTENTS Important notes page 2 Commissioning the stove page 8 Technical information page 3 Check for spillage page Dimensions and clearances page 4 Customer briefing page 10 Installation page 5 Servicing page 11 Important notes This stove is a fuel effect radiant convector. Before installation, ensure that the local distribution condition (identification of the type of gas and pressure) and the adjustment of the appliance are compatible.
  • Page 5 TECHNICAL INFORMATION NATURAL GAS ONLY COUNTRY OF GB,IE,AT,BG,CH,CZ, DE BE,FR DESTINATION DK,EE,ES,FI,GR,HR,I T,LT,LV,NO,PT,RO,SE, SI,SK,TR APPLIANCE GAS I2E+ CATEGORY HEAT INPUT NET 6.95 kW/4.3 kW 6.95 kW /4.3 kW 6.95 kW /4.3 kW HIGH/LOW SUPPLY PRESSURE 20 ± 1 20 ± 1 20/25 ±...
  • Page 6 Dimensions & clearances FIG 1 Door locking screw...
  • Page 7 INSTALLATION Install the stove in accordance with the requirements given below. If a concealed gas connection is to be made prepare the pipe work prior to installing the stove. Positioning the Stove Clearances from non-combustible material must be at least 120mm on both sides and 75mm at the back.
  • Page 8 Flue restrictor Ring A 62mm restrictor ring is supplied with the stove. If the flue diameter is 150mm or more this ring should be fitted inside the flue connection. There may however be certain circumstances where the restrictor ring causes the stove to fail the spillage test. In such cases the restrictor ring MUST be removed.
  • Page 9 Positioning the logs 1. Fit log A, as shown (Fig. 3) 2. The embaglow can now be fitted on top of the granular dispersal medium as directed on the back of the packet. Take care not to put embaglow material too near the pilot as this can interfere with ignition.
  • Page 10 Commissioning Once the fire is in place, connected, flued correctly, and the logs are in place, you can proceed with lighting the stove and ensuring the all the features are working correctly. The Fire control unit is located behind the controls cover panel. The pilot light is located centrally at the rear of the burner.
  • Page 11 Draught diverter cover Remove 2 screws Fig.5 Draught diverter Bottom edge of draught diverter...
  • Page 12 CHECK FOR SPILLAGE Remove the 2 screws securing the draught diverter cover at the rear of the stove (Fig.5). Close all doors and windows in the room containing the appliance. Light the stove and set the control unit to ‘HIGH’, leave the appliance for 5 minutes. Apply a smoke match along the bottom edge of the draught diverter (Fig.5).
  • Page 13 Servicing It is essential that the stove is regularly serviced, and the flue system checked by a qualified person. Servicing instructions The stove is fitted with a spillage monitoring system consisting of a thermal switch connected to a thermocouple interrupter. This system is not adjustable and must not be put out of action. If any parts of the spillage monitoring system require replacement only original manufacturer’s parts must be used.
  • Page 14 Opus commissioning checklist General information Stove purchased from Telephone number Stove installed by Telephone number CPS registration with (E.g. GAS SAFE) CPS registration number Installation date Stove model Physical checks Installation is in accordance with the design, including material specification, flue...
  • Page 15 Opus-Trio Gas-August-2019-V002 FIRED BY DESIGN www.opusstoves.co.uk Imported to the UK Firepower, Flightway, Dunkeswell, Honiton, Devon, EX14 4RD, UK, 0844 332 0155, info@firepowerheating.co.uk...