Advertisement

EGIP
READ ME

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EGIP and is the answer not in the manual?

Questions and answers

Summary of Contents for Intelligas EGIP

  • Page 1 EGIP READ ME...
  • Page 2 ABOUT THESE INSTRUCTIONS The EGIP system must be installed in accordance with these installation instructions. Failure to do so may result in damage to the unit, injury or even death. Please ensure all pages are read prior to attempting installation or calling our technical team. Ta.
  • Page 3 Extract fans Supply fans Rather than having to make up countless links, the various interlock inputs can be disabled using the “inputs disable switch”. The disable switches correspond to the input terminals e.g. switch 1 controls the Estop input. Switch 2 controls the fire alarm input and so-on. If the fire alarm input isn't being used then push the second switch up, this will disable that input.
  • Page 4 All Intelligas products are designed to be as flexible and adaptable as possible. We realise that site conditions can vary, even temporarily. These switches can turn certain parts of the software on and off and therefore should be used carefully. Below is a list of what the switches do.
  • Page 5 Emergency stop, electrical installation Use the terminals in the panel marked gas pressure switch. Use the terminals in the panel as previously described CO2 detector connection Gas detector (repeat on second if fitted) Extract fans Supply fans...
  • Page 6 Mains wiring Fire Panel Main panel Spur Note: The supply spur MUST be a dedicated supply for the EGIP. Do not supply the fans from the same supply Gas Schematic Main kitchen gas valve Dungs gas pressure switch To kitchen appliances...
  • Page 7 Connection and testing Prior to power up testing. Never perform an insulation resistance test on the wiring connected to the panel or the peripheral items. If an IR test is required then this should be performed prior to termination and the cable ends grounded / discharged after the test. After connecting and testing the operation of all the peripheral equipment, power may then be applied.

Table of Contents