SHOCKERHITCH AIR EQUALIZER Setup Instructions

SHOCKERHITCH AIR EQUALIZER Setup Instructions

Advertisement

Installation:

STEP 2
Remove your weight distribution head from
existing shank.
STEP 4
Install your existing weight distribution head on
the Air Equalizer bar using your original
mounting bolts.
SHOCKERHITCH
AIR EQUALIZER SHOCKERHITCH
SETUP INSTRUCTIONS
Thank you for choosing a SHOCKERHITCH
STEP 1
Measure your existing ball height from the
ground for future reference.
STEP 3
Assemble the Air Equalizer Shockerhitch to the
Shocker XR adjustable channel using supplied
5/8" pins. Slide assembly into the receiver tube
on tow vehicle.
Page 1
®

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AIR EQUALIZER and is the answer not in the manual?

Questions and answers

Summary of Contents for SHOCKERHITCH AIR EQUALIZER

  • Page 1 STEP 2 Remove your weight distribution head from existing shank. STEP 3 Assemble the Air Equalizer Shockerhitch to the Shocker XR adjustable channel using supplied 5/8" pins. Slide assembly into the receiver tube on tow vehicle. STEP 4...
  • Page 2 Maintenance: The Shockerhitch should be greased regularly at the zerk located on the m ain pivot bolt. NOTE: IT IS HIGHLY RECOMMENDED THAT THE HITCH BALL BE GREASED TO REDUCE W EAR AND IMPROVE SHOCKER ACTION.

Table of Contents