Download Print this page

ZCG Y100 Series Installation Manual

Advertisement

Quick Links

NOTE : The installation, performance testing and maintenance of this antenna must be undertaken by
experienced personnel only. ZCG Scalar disclaims any liability or responsibility for any event whatsoever
which occurs as a result of improper or unsafe installation practices.
Delivery
 Upon delivery, unpack the antenna carefully and check the contents against the packing slip. It is most important to inspect the
antenna to ensure that no damage has occurred in transit and that all items ordered are present.
 If there is any damage or any item is missing, advise the cartage contractor and make appropriate notes on the delivery docket
before signing. if possible, any damaged items should be photographed. Then contact ZCG Scalar immediately.
 Store the antenna in a safe location away from vehicular traffi c. Ensure materials are kept dry, and if necessary cover materials with
a water proof cover to prevent water ingress and damage.
Model and Frequency
 The model will be marked on the label to be found adhered to the antenna.
 This label will also state the frequency range for which your antenna has been tuned.
 A detailed specifi cation sheet is available to download from
General Precautions
 At all times standard OH&S working conditions must be maintained. Use common sense during all installation work.
 Never install an antenna where contact with electrical power lines is possible. Serious injury or death may occur. Power lines,
telephone lines and guy wires can look the same. Assume any wire or line can electrocute you.
 Always wear an approved safety harness when climbing an antenna mast or working on a raised platform where a fall could occur.
 Always take heed of all RF Electromagnetic Radiation Hazard Warning Signs which appear at the installation site. Never work where
contact with live antennas is possible.
Installation
 Assemble the Yagi as per the diagram and instructions to be found on the next page. The antenna must be mounted clear of other
antennas and any metallic objects which may cause interference or distortion of the radiation pattern.
 The antenna should be secured using ZCG Scalar recommended clamp, or an equivalent. Take care not to over-tighten the clamp
beyond reason. A strut kit is recommended to support the boom.
Cable and Connectors
 The antenna feeder cable should be secured so as no stress is placed upon any connections.
 Ensure that connector mating surfaces are not damaged and are clean and dry. The male connector pin should be set so as to not
damage the female connector pin. Tighten the connectors fi rmly and make sure they are seated correctly. The connection should be
sealed with two layers of self-amalgamating tape to prevent ingress of moisture.
 The feeder cable should be earthed to avoid a destructive power surge in the event of a lightning strike.
Return Loss Test
 Following installation of feeder cable, measure the return loss at the feeder cable input and check that there is no major departure
from the factory specifi cation.
Power Up
 Commence the power up by applying low power to the antenna. Monitor the forward and refl ected power at the transmitter.
Progressively increase the power to full power and monitor the forward and refl ected levels.
 Only operate the antenna at the specifi ed power levels. Exceeding the stated power levels will invalidate the warranty.
 REMOVE TRANSMITTER POWER IMMEDIATELY IF ANY ADVERSE CONDITIONS ARE DETECTED.
Maintenance
 The antenna and its components have been designed for high reliability and low maintenance. We recommend that you conduct a
routine annual mechanical inspection of the antenna, connections and feeder cable, together with a check of the return loss.
Y100 Series
Y100 Series
Installation Guide
Installation Guide
Page 1 of 2
Page 1 of 2
www.zcg.com.au
Updated 28th August 2013

Advertisement

loading

Summary of Contents for ZCG Y100 Series

  • Page 1  The antenna should be secured using ZCG Scalar recommended clamp, or an equivalent. Take care not to over-tighten the clamp beyond reason. A strut kit is recommended to support the boom.
  • Page 2 Y100 Series Y100 Series Installation Guide Installation Guide Page 2 of 2 Page 2 of 2 1. Fit the dipole to the boom using bolt and washer through clamp plate, dipole tube, sad- dle, washer and ‘Nyloc’ nut. 2. Attach insulated side of dipole using short bolt and washer through boom into plastic support.