Cisco 7000 Series Hardware Installation And Maintenance page 82

Hide thumbs Also See for 7000 Series:
Table of Contents

Advertisement

If
your
ports
To
perform
No
3/16-inch
No
the
No
Antistatic
Youi
Ontia Configuraton
After
configure
use the setup
information
Before
passwords
addresses
the information
Host
Passwords
and
Protocols
Bridging
IP addresses
Zone
Operating
or 16
often
For
complete
Checkhst
nstaUation
Use
the
historical
when
Site
Log
Ethernet
cables
interface
need
will
3/16-inch
yoU
maintenance
on
chassis
and
3/16-inch
flat-blade
Phillips
screwdriver
flat-blade
screwdriver
for
Phillips
remove
cover
to
backplane
screwdriver
for
Phillips
mat
foam pad
or
antistatic
ESD
own
grounding
strap
nformation
the chassis and
install
you
verify
and
the system
individual
command
or standard
facility
should
be
you begin you
prepared
and
routing
protocols
or speeds
of operation
rates
need
are
you
to
likely
name
router
for
the
unauthorized
to
prevent
individual
terminal
for
virtual
route
to
you
plan
whether
configuration
and
masks
subnet
network
names
numbers
for
interfaces
speeds
specific
Mbps
and
serial interfaces
depends on
the speed
of
instructions
configuration
Checklist
Installation
in
Figure
what was done
record
of
each
or
verification
procedure
end
of
at the
this
described
thumbscrews
instead
use
of the slide-type locks
screwdriver
flat-blade
to
replace
or
components
to
replace
screwdrivers
the captive
for
for
the
screws
slotted
captive
and
the
harness
cover
power
or replace
the
power
supply
and
fan
the
power
supply
tray
IPs or replace
will
remove
if
you
ESD
or
the
disposable
strap
hardware
the
that
all
is
before
interfaces
you
can
connect
commands
configuration
with
system-wide
global
and
with
information
configuration
routing
protocol
specifics
depending
upon
configuration
your
access
privileged-level
lines
and
you
will
use bridging
IP
you
if
are
routing
node
numbers
for
new
the
or
Token
for
example
of
at
operate
speeds
up
which
remote
device
the
it is
to
the
software
refer
related
to
2-21
with
to assist
you
when Make
whom
and
by
When
checklist
completed
the
is
the other records
with
chapter
along
Initial
Configuration
used
on
locks with
the
slide
jackscrews
FRUs
you need
the
following
on
installation
screws
on
the chassis cover
panel
must remove
you
backplane
cover
or the arbiter
on
the
components
included
with
the
system
you must
operating
properly
networks
external
to
enter
the
to
configuration
host
such
parameters
as
such
interface
for each
on
and
so
Following
is
EXEC
command
the
to
interpreter
so on which
if
interfaces
interfaces
if
required
interfaces
at either
Ring
operate
The
Mbps
of an
to
interface
speed
attached
documentation
and
installation
to
your
provide
and
checklist
this
of
copy
completed
is
it
place
new
for
router
your
for Installation
Preparing
Information
EIP
tools
the IPs
board
You
can
names
as
some
of
indicate
in
your
2-31

Advertisement

Table of Contents
loading

This manual is also suitable for:

70107000

Table of Contents