Table of Contents

Advertisement

Available languages

Available languages

Quick Links

Beispiel:/Example: 1252DIG
Bedienungsanleitung/Operating Manual
Peakmeter Serie/Series 1252

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Peakmeter 1252 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for RTW Peakmeter 1252 Series

  • Page 1 Beispiel:/Example: 1252DIG Bedienungsanleitung/Operating Manual Peakmeter Serie/Series 1252...
  • Page 2 - - - - - - - - - - - - - RTW GmbH & Co. KG 50765 50746 MAN 1252 Bedienungsanleitung/Operating Manual Peakmeter Serie/series 1252...
  • Page 3 Über diese Anleitung Dieses Symbol wird im gesamten Handbuch verwen- det, um Sie auf weiterführende Informationen zum betreffen- den Thema hinzuweisen. Scope of this manual This symbol is used in the manual to draw your attention to related topics. Peakmeter Serie 1252 Über diese Anleitung/Scope of this manual •...
  • Page 4 Sicherheits-Symbole Safety symbols Seite/Page ii • Über diese Anleitung/Scope of this manual Peakmeter Serie 1252...
  • Page 5: Table Of Contents

    Inhaltsverzeichnis Einführung ..............1-1 Erste Schritte ..............2-1 Bedienungshinweise .............3-1 Introduction ..............4-1 Getting started..............5-1 Peakmeter Serie 1252 Über diese Anleitung/Scope of this manual • Seite/Page iii...
  • Page 6 Operating instructions ...........6-1 Zeichnungen / Drawings ..........7-1 Anhang A: Technische Daten ........... A-1 Appendix B: Specifications ..........B-1 Anhang C: CE-Konformitätserklärung ......C-1 Appendix C: EC-Declaration of Conformity ......C-2 Seite/Page iv • Über diese Anleitung/Scope of this manual Peakmeter Serie 1252...
  • Page 7: Einführung

    1. Einführung Bild 1-1: Peakmeter 1252DIG Peakmeter Serie 1252 Einführung • Seite 1-1...
  • Page 8 Seite 1-2 • Einführung Peakmeter Serie 1252...
  • Page 9: Erste Schritte

    2. Erste Schritte 2.1.1. Spannungswahl Bitte beachten Sie die korrekte Bestückung der Sicherung entspre- chend der gewählten Spannung. Die Werte lauten für den Betrieb mit 230 V 50 mA träge und bei 115 V Betrieb 100 mA träge. Umschaltung und Austausch dürfen nur bei abgezogenem Netzanschlusskabel er- folgen! Peakmeter Serie 1252 Erste Schritte •...
  • Page 10 Seite 2-2 • Erste Schritte Peakmeter Serie 1252...
  • Page 11 2.4.1. Stromversorgung 2.4.2. XLR-f-Anschluss: AES/EBU-Eingang Abschlusswiderstand siehe Abschnitt 3.5.1. 2.4.3. Cinch-Anschluss: SPDIF-Eingang Ω 2.4.4. Toslink-Anschluss: Optischer Eingang Peakmeter Serie 1252 Erste Schritte • Seite 2-3...
  • Page 12 2.4.5. XLR-m-Anschluss: Signal-Ausgang Ω Seite 2-4 • Erste Schritte Peakmeter Serie 1252...
  • Page 13: Bedienungshinweise

    3. Bedienungshinweise Abschlusswiderstand siehe Abschnitt 3.5.1. und 3.5.4. Achtung: Bei Ausfall der Stromversorgung ist der AES/EBU-Signal- fluss unterbrochen. Peakmeter Serie 1252 Bedienungshinweise • Seite 3-1...
  • Page 14 Bitte achten Sie darauf, das der Bedienknopf der Schiebeskala je- weils bis zum Anschlag geschoben wird. Ansonsten kann die eventu- ell notwendige Umschaltung der Ballistik entsprechend der Norm nicht korrekt erfolgen. Konfiguration siehe Abschnitt 3.3. Seite 3-2 • Bedienungshinweise Peakmeter Serie 1252...
  • Page 15 Peakmeter Serie 1252 Bedienungshinweise • Seite 3-3...
  • Page 16 3.5.1. Position der Codierbrücken Vor Änderungen an den internen Codierbrücken entfernen Sie unbedingt alle Netz- und Signalverbindungen! B a s i c p c b H E A D R E F S M P L O p t i c a l 1 1 0 S T D B Y R E S...
  • Page 17: Introduction

    4. Introduction Fig 4-1: Peakmeter 1252DIG Peakmeter series 1252 Introduction • Page 4-1...
  • Page 18 Page 4-2 • Introduction Peakmeter series 1252...
  • Page 19: Getting Started

    5. Getting started 5.1.1. Changing line voltage selection Be sure the proper value fuse is used for the voltage range selected (230 V 50 mA slow blow or 115 V 100 mA slow blow). Setting of voltage selector and changing fuse must be done only when mains power cable is unplugged! Peakmeter series 1252 Getting started •...
  • Page 20 DO NOT Page 5-2 • Getting started Peakmeter series 1206...
  • Page 21 5.4.1. Power supply 5.4.2. XLR-f connector: AES/EBU input Terminating resistor see section 6.5.1.. 5.4.3. Cinch connector: SPDIF input 5.4.4. Toslink connector: OPTICAL input 5.4.5. XLR-m connector: signal output Ω Peakmeter series 1252 Getting started • Page 5-3...
  • Page 22 Page 5-4 • Getting started Peakmeter series 1206...
  • Page 23: Operating Instructions

    6. Operating instructions Terminating resistor see section 6.5.1. und 6.5.4. Warning: Power supply failures interrupt the passage of the signal looped through the unit. Headroom configuration see section 6.4. Please note that the scale slider button must be pushed until it locks on either one end of the scale.
  • Page 24 Over detector settings see section 3.3. Seite 6-2 • Operating instructions Peakmeter series 1252...
  • Page 25 Peakmeter series 1252 Operating instructions • Page 6-3...
  • Page 26 6.5.1. Jumper positions Before changing the settings of the internal jumper positions remove all mains and signal connections! B a s i c p c b H E A D R E F S M P L O p t i c a l 1 1 0 S T D B Y R E S...
  • Page 27: Zeichnungen/Drawings

    7. Zeichnungen/Drawings Peakmeter Serie 1252 Zeichnungen/Drawings • Seite/Page 7-1...
  • Page 28 1 x Tischgerät/table top instrument 1 x Anschlusseinheit/bracket 11280 (1206, 1260,1252, PLM300) 19“-3HE-Blende für ein Einbauinstrument 40 x 190 mm und ein Tischgerät 19’’-3U rack mount kit for one plug-in instrument 40 x 190 mm and one table top instrument Bestell-Nummer/Order no.: 12961 1 x Tischgerät/table top instrument (1206, 1260,1252, PLM300) 19“-3HE-Blende für ein Tischgerät...
  • Page 29 7.3.1. Allgemeine Teile Best. Nr. Beschreibung Typ/Norm Modelle Mechanische Teile Allgemeine elektronische Teile Platinen Peakmeter Serie 1252 Zeichnungen/Drawings • Seite/Page 7-3...
  • Page 30 7.3.2. Display und Skalen Best. Nr. Beschreibung – für Modelle 1252DIG bis Seriennummer 1999 (3-Phasendisplay): – für Modelle 1252DIG ab Seriennummer 2000 (5-Phasendisplay). – für Modell ab Seriennummer 2310: – für Modelle 1252DIG-B ab Seriennummer 1000 (5-Phasendisplay): – für Modelle 1252DIG-N ab Seriennummer 1000 (5-Phasendisplay): –...
  • Page 31 7.4.1. Common parts Part No. Description Typ/Standard Mechanical parts Common electronical parts PCB’s Peakmeter Serie 1252 Zeichnungen/Drawings • Seite/Page 7-5...
  • Page 32 7.4.2. Display and scale Part No. Description Typ/Standard – for models 1252DIG up to serial number 2000 (3-phase display): – for models 1252DIG with serial number 2000 and higher(5-phase display): – for models 1252DIG with serial number 2310 and higher: –...
  • Page 33: Anhang A

    Anhang A: Technische Daten Allgemeine Daten Ω Ω Ω Modus „Digital-Skalierung“ (alle Geräte) Peakmeter Serie 1252 Technische Daten • Seite A-1...
  • Page 34 Modus „Quasi-analog-Skalierung“ • 1252DIG mit Skalierung gem. IRT 3/6, IEC 268/10 • 1252DIG-B mit Skalierung gem. British Standard IIa • 1252DIG-N mit Skalierung gem. Nordic Rec. N9 Lieferumfang 1252DIG 1252DIG-B 1252DIG-N Seite A-2 • Technische Daten Peakmeter Serie 1252...
  • Page 35: Appendix B: Specifications

    Appendix B: Specifications General Ω Ω Ω „Digital scale“ mode(all types) Peakmeter series 1252 Specifications • Page B-1...
  • Page 36 „Quasi-analog scale“ mode • 1252DIG with IEC 268/10 scale • 1252DIG-B with British Standard IIa scale • 1252DIG-N with Nordic Rec. N9 scale Items delivered 1252DIG 1252DIG-B 1252DIG-N Page B-2 • Specifications Peakmeter series 1252...
  • Page 37 EN 61000-4-6 EN 61000-4-11 Sicherheit 73/23/EWG EN 60950 (1992 + A1/1993) Geprüft und dokumentiert von nachfolgend aufgeführten Firmen: ELEKLUFT GmbH, Bonn, akkreditiertes Prüflabor RTW GmbH & Co.KG, Köln Datum und Unterschrift des Verantwortlichen: 20.02.2001 Peakmeter Serie 1252 Konformitätserklärung • Seite C-1...
  • Page 38 73/23/EEC EN 60950 (1992 + A1/1993) Tested and documented by the following companies: ELEKLUFT GmbH, Bonn, accredited EMC laboratory RTW GmbH & Co.KG, Köln Date and signature of the responsible person: 20.02.2001 Page C-2 • Declaration of Conformity Peakmeter series 1252...

Table of Contents