Azanechiller
Installation Instructions
1.0
Receipt of Unit
When the unit is delivered to the jobsite, it should be checked thoroughly to ensure all
required items have been received and are free of any shipping damage prior to signing
the packing note. Any damage or missing items must be indicated on the packing note,
and Star Refrigeration Ltd must be informed of such.
2.0
Design Conformity
Star certify that the
Machinery Directive
Pressure Equipment Directive
Pressure Equipment Regulations
Electromagnetic Compatibility Directive
Low Voltage Directive
Ecodesign Directive
To comply with these directives appropriate national and harmonised standards have
been applied. These are listed on the Declaration of Conformity, supplied within the
Quality Dossier for each plant.
Before using the chiller, the recommendations set out in the Operating & Maintenance
Manual must be read.
3.0
Chiller Positioning for Efficient Operation
3.1
Chiller Location
The unit must be located away from air vents into buildings. The unit must be placed
in an area which only affords access to competent operators and technicians. Access to
the unit by the general public must be prevented. The supporting base upon which the
chiller will sit must be level (tolerance 10mm on both axes) and solid enough to support
the chiller weight during normal operation.
If the chiller raised via steelwork or AV mounts, a suitable walkway/working platform
should be considered to allow both personnel access for servicing and removal of
equipment.
G:\Design\Standard Azanechiller 2.0\01 Design\O & M Manual\Issued\012 Installation Instructions\Azanechiller Installation
Instructions.F.docx
Azanechiller
conforms with the following EC Directives:
(MD)
2006/42/EC
(PED)
2014/68/EU
(PER)
2016
(EMC)
2014/30/EC
(LVD)
2014/35/ED
(ED)
2009/125/EC& 2015/1095
Page 1 of 8