Description:
This unit is multi activity inflatable play structure. It is a sports challenge and competition game.
In each session 2 riders go through vertical and horizontal challenge blocks then climb up the stairs then Obstacle
Course down at the other end.
Setup Instructions:
1. When selecting a site, make sure it is level and large enough for the device and tethers.
2.
The ideal site is a firm grassed area.
3. If possible, try to face the Obstacle Course away from direct sun so that the sliding surface does not get too hot.
4. Place a ground tarp on the selected site
5. Align the Obstacle Course and unroll it on the tarp.
6. Attach upper tie ropes.
7. Do not stake down the unit until it is inflated.
8. Attach the blowers to the ducts and secure with Velcro strip.
9.
Minimum clearances around Obstacle Course are 6' preside and 10' in front. Overhead clearances to any
moving object (tree branches for example) shall be 4'.
10. Clearance to power lines shall be at least 20' form the top point of the game in any direction.
11. Inflate the unit making sure the blower is on high setting and that all deflation vents are closed.
12. Connect 2 1.5 HP blowers (1080 CFM) to power source, check that the Obstacle Course has been properly
unfolded and switch on the blowers. The blowers should be directly connected to the power supply.
13. If an extension cord is to be used, it must be 14Ga minimum and should not exceed 50ft length.
14. Most household extension cords are 16Ga and should not be used. Longer cords will reduce the power of the
blower and will not maintain full inflation of the unit.
15. Lightly stake the lower attachment points using steel stakes, min 5/8" dia x 12" long.
16. Minimum of 10 anchors (8 lower & 2 upper tethers). Each side of the game shall be secured by means of 5, 12:"
steal anchor stakes driven into firm ground (grassed area is preferred). If ground stakes cannot be used, then
attach minimum 100lb weights to each anchor point
17. Adjust the Obstacle Course by grabbing hold of the walls and stabilize as necessary.
18. Check blowers are sitting firmly and that the air ducts are not kinked.
19. Adjust base supports if necessary and drive into ground fully
20. Drive in the upper restraint anchors, attach the upper ties and tension evenly.
21. Look at Obstacle Course from a slight distance to ensure it is sitting square and that the tethers are equally
tensioned.
22. Climb the Obstacle Course and check that the sliding mat is properly attached and generally inspect the
Obstacle Course to make sure it is serviceable. Check condition of the sliding surface and apply Armor-All if
necessary.
23. Erect signs and establish a no-walk zone around the blowers and upper tethers.
3 IN 1 Obstacle Course User Operating Manual
For 3 IN 1 Obstacle Course
1
Need help?
Do you have a question about the 3 IN 1 Obstacle Course and is the answer not in the manual?
Questions and answers