Euroscreen FREYA 2 Assembly Instructions Manual

Advertisement

04 sep 2018, 15:09
Freya 2
Made in Sweden
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FREYA 2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Euroscreen FREYA 2

  • Page 1 04 sep 2018, 15:09 Freya 2 Made in Sweden...
  • Page 2 Please read through the manual completely before installation and usage. Tack för att ni valt en Euroscreen som en del i er AV-installation. Vi ® hoppas den kan ge er många timmar av underhållning och/eller utbildning, beroende på...
  • Page 3 Assembly / Montering EN: The Euroscreen ® Freja2 case is intended to be mounted in the ceiling, with or without threaded rods (must be ordered seperately). Keep the screen horizontal at all times during transport and installation. The case is prepared with multiple fastening points (see fig1).
  • Page 4 Removing the lid / Ta bort locket The construction of the lid’s locking mechanism is shown in fig 4 - 6. There is one locking plate at each end of the lid. The locking plate is slightly spring loaded and hooks into the endcap plates.
  • Page 5 ning Tensioning / Trådspän EN: To keep the surface flat you may need to adjust the tensioning as the surface will change with time and fig 7 temperature. This is done with the tensioning screw marked in fig 7. It is adjustable with 1/6 turn increments. Only adjust it in a single increment at a time! 1.
  • Page 6 The Waste Electrical and Electronic Equipment Directive (WEEE Directive) is the European Community directive 2002/96/EC on waste electrical and electronic equipment (WEEE) which, together with the RoHS Directive 2002/95/ ® EC, setting collection, recycling and recovery targets for all types of electrical goods.Applicable Euroscreen products are labeled with the WEEE symbol.
  • Page 8 Draper Europe AB • Västervallvägen 6 SE-302 50 Halmstad Sweden Tel: +46 35-14 42 90 info@drapereurope.se • www.draperscreens.se...

Table of Contents