Section 7: Operation And Maintenance; Sequence Of Operation; To Shut Off Heater; To Start Heater - Roberts Gorden CTH2040NP Instructions Manual

Fuel conversion kit for vantage ii cth2-40, vantage ii cth2-60, vantage ii cth2-80, vantage ii cth2-100, vantage ii cth2-125, vantage ii cth2-150, vantage ii cth2-175 gas heaters
Table of Contents

Advertisement

VANTAGE
®
II F
C
I
UEL
ONVERSION
NSTRUCTIONS

SECTION 7: OPERATION AND MAINTENANCE

DANGER
Electrical Shock Hazard
Disconnect electric
before service.
Heater must be
connected to a properly
grounded electrical
source.
Failure to follow these instructions can result in death, electric shock, injury or property damage.
This heater is equipped with a hot-surface ignition
system.

7.1 Sequence of Operation

3. Turn the thermostat up. When the thermostat
calls for heat, the SmartValve
After a short period, power is supplied to the
blower motor.
4. When the motor approaches nominal running
RPM, the pressure switch closes and signals
the ignition module/SmartValve
5. The ignition module/SmartValve
gizes the hot-surface igniter for a timed warm-up
period (approximately 45 to 60 seconds). After
the warm-up period, the gas valve is energized.
6. If a flame is detected, the gas valve remains
open and the igniter is de-energized. When the
call for heat is satisfied and the system control
mechanism de-energizes the burner line voltage
supply, the gas is turned off.
7. If no flame is detected by the flame sensing rod,
the igniter is de-energized and the module/
SmartValve
®
II will close and a purge period
begins. After the purge, the module/SmartValve
II acts to power the igniter for a second warm-up
period and a second trial for ignition period. If
flame is still not established, a third purge,
warm-up, and trial cycle begins. After four trials,
the module/SmartValve
hour or until reset.
18 of 21
Explosion Hazard
Turn off gas supply to
heater before service.
®
II will energize.
®
II.
®
II then ener-
®
II will lockout for one
WARNING
Burn Hazard
Allow heater to cool
before service.
Tubing may still be hot
after operation.
8. If the flame extinguishes during operation, the
igniter module will provide multiple trial
sequences described in step 5. If ignition is not
re-established, the module/SmartValve
lockout for one hour or until reset.
9. After lockout, reset by turning down thermostat
for five seconds, and then raising it again to
desired temperature, or by disconnecting power
and then reconnecting.

7.2 To Shut Off Heater

Set thermostat to lowest setting.
Turn OFF electric power to heater.
Turn OFF manual gas valve in the heater supply line.

7.3 To Start Heater

Turn gas valve and electric power OFF and wait five
minutes for unburned gases to vent from heater.
Turn ON main gas valve.
Turn ON electric power.
Set thermostat to desired temperature. Burner
should light automatically.
7.4 Pre-Season Maintenance and Annual
Inspection
®
To ensure your safety and years of trouble-free oper-
ation of the heating system, service and annual
inspections must be done by a contractor qualified in
the installation and service of gas-fired heating
equipment.
Turn off gas and electric supplies before performing
service or maintenance. Allow heater to cool before
Cut/Pinch Hazard
Wear protective gear
during installation,
operation and service.
Edges are sharp.
®
II will

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cth2060npCth2080npCth2100npCth2125npCth2150npCth2175np

Table of Contents