Download Print this page

Mitsubishi Electric CITY MULTI CMY-ER100CBK Installation Manual page 3

Twinning kit

Advertisement

(2) Low-pressure twinning kit in CMY-ER100CBK
Use 1 in table "(1) Package Contents." Attach items g , h ,
and i to the stop valve sheet metal and then to the low-
pressure twinning kit to hold it into place.
1. Attach item h to the stop valve sheet metal.
2. Attach the packing and saddle.
3. Secure the low pressure twinning kit.
(3) Routing the pipe through the bottom
(1) Braze item 6 high-pressure pipe to the refrigerant service valve so
that the dimples on the pipe are parallel to the edge of the cutout
hole.
pand the end of the eld-supplied pipes, and braze them to
item 6 high-pressure pipe.
(2) Attach item 1 low-pressure twinning kit to the sheet metal of the
refrigerant service valve with item 3 screw, and braze it to the
refrigerant service valve.
(3) Braze item 5 elbow pipe to the eld-supplied pipe rst, and then
braze it to item 1 low-pressure twinning kit.
( ) lare the eld-supplied pipe end, and braze the pipe to the low-
pressure pipe in the middle.
(5) Wrap the pipe in front of item 1 low-pressure twinning kit with item
8 pipe cover, and attach compressor cables to item 8 pipe cover
with item e cable tie to keep them out of direct contact with the
pipes.
CAUTION
· Before heating the pipes, place a wet towel on the refrigerant service
valve to keep its temperature below 120˚C [248˚F].
· Direct the flame away from the cables and sheet metals inside the unit
so as not to burn them.
(4) Routing the pipe through the front
(1) Braze item 7 high-pressure pipe to the refrigerant service valve.
(2) Attach item 1 low-pressure twinning kit to the sheet metal of the
refrigerant service valve with item 3 screw, and braze it to the
refrigerant service valve.
(3) Braze item 5 elbow pipe to the eld-supplied pipe rst, and then
braze it to item 1 low-pressure twinning kit.
(4) Braze item 4 elbow pipe to the low-pressure pipe in the middle.
(5) Wrap the pipe in front of item 1 low-pressure twinning kit with item
8 pipe cover, and attach compressor cables to item 8 pipe cover
with item e cable tie to keep them out of direct contact with the
pipes.
CAUTION
· Before heating the pipes, place a wet towel on the refrigerant service
valve to keep its temperature below 120˚C [248˚F].
· Direct the flame away from the cables and sheet metals inside the unit
so as not to burn them.
(5) Slope of twinning pipes (high-pressure side only)
Make sure the slope of the twinning pipes are at an angle
within ±15˚ to the horizontal plane.
If the slope exceeds the specified angle, the unit may be
damaged.
3
3
Refrigerant
service valve
Section to be brazed locally
Connect the pipe so that the
dimples on the 6 high pressure
pipe are parallel to the edge of
the cutout hole.
Field-supplied
pipes
3
7
Field-supplied pipes
Note. Refer to the figure below for the installation position of the twinning pipe.
Slope of the twinning pipe is at an angle within ±15° to the horizontal plane.
3
g,h,i
3
5
Field-supplied pipes
8
Wrap the pipe cover here.
Attach compressor cables to pipe
cover with cable tie to keep them
out of direct contact with the pipes.
1
8
Wrap the pipe cover here.
Attach compressor cables to pipe
cover with cable tie to keep them
out of direct contact with the pipes.
5
4
Twinning pipe on the high-pressure side
1
1

Advertisement

loading