Series 1 and 2 Vertical / Horizontal Air Handler without “A” Coil Series 3 and 4 Vertical / Horizontal Air Handler with “A” Coil - Up to 125,000 BTUH Heating Capacity - 1.5 to 5.0 Ton Cooling Capacity - Series 1 and 3 handles up to 1,000 CFM of air movement - Series 2 and 4 Series handles up to 2,000 CFM of air movement INST ALLA...
Product & Safety Information Following terms are used to bring attention to the CAUTION presence of various risk levels, or to important information concerning product life. Do not use this appliance if any part has been under water. Have a qualified service WARNING technician inspect the appliance and to replace any part of the control system that...
Installation A. Code Compliance • Zero clearance is permissible for discharge air plenum and duct. • Air Handler installation must conform with the instructions in this manual and where applica- • Refer to the boiler or Combination Water ble: Heater installation manual for installation - Local, state, provincial, and national clearances.
Installation • Use silver solder or other high temperature - U.S.A - National Electrical Code and any brazing alloy to sweat refrigerant lines to the other national, state or local code require- cooling coil. ments having jurisdiction. - Canada C.S.A. C22.1 Canadian •...
Installation - Piping 12" max. Air Handler Hot Water Boiler/ HM Combination Water Heater • Size primary manifold for total flow of all ciculators • Size each circulator to individual circuit requirements • Install balancing valves to adjust flow to distribute heat to all zones Fig.
Installation 120 VAC Circulator Equipment PR-1 Ground Aquastat (by others) Blower 120 V 24 V Freeze Protector Room Thermostat DELTA Snap-set C & 1 Boiler Terminals T - T Outdoor Unit Cond. Lo Contractor Lock-out (by others) Notes: All wiring must comply with the National Electrical Code and additional national, state or local code requirements.
Installation DELTA Snap-set C-1 120 VAC Boiler T - T Terminal INPUT Y R W C G Legend Field Wiring High Voltage Low Voltage 24 VAC XF MR 120 VAC BLOWER MOTOR Fig. 4: Internal Wire Connection Diagram...
Operation and Maintenance A. Start up Procedures CAUTION - Refer to the Hot Water Boiler or HM Combination Water Heater Installation To avoid damage to blower motor, do not Manual for start up procedures. over oil. 1. Ensure all isolation valves are open. Misc.