Advertisement

CKS
®
& CCS
®
Assemblage

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CKS and is the answer not in the manual?

Questions and answers

Summary of Contents for Forest CKS

  • Page 1 ® & CCS ® Assemblage...
  • Page 2 Pull the other end of the cord through the second ® that the gap of the cord connector is facing pulley and connect it into the other side of the first outwards the track and with CKS ® , the gap is facing cord connector.
  • Page 3 Fix the second cord connector on the opposite cord, connector into the cord channel of the track. (CCS ® facing outside, CKS ® to the middle of the track). Slide the master carrier underlap, together with the By pulling the cord, the side of operation can be deter- second cord connector into the cord channel of the mined.
  • Page 4 , with cord adjustability. This application can be made for CCS ® , as well for CKS ® . The advantage is that the requested drop height can be deter- mined at a later stage. This feature makes the system very suitable for pre-assembling. This application is also possible for one-way draw.
  • Page 5 • The maximum length for cording / chaining CCS ® is as follow: 6,10 mtr (20 Ft.) and for CKS ® is 6 mtr (19.7 Ft.). • The above sizes are without the pulleys! With pulleys, the sizes are as follow:...

This manual is also suitable for:

Ccs

Table of Contents