Download Print this page

Feit Electric GLP24FS/VM/27W/LED Installation Instructions Manual page 2

Led grow light

Advertisement

Available languages

Available languages

6 in. Hanging Cable Installation
1
ENSURE THE FIXTURE IS NOT PLUGGED IN TO THE ELECTRICAL POWER.
2
Attach two hanging hooks to the ceiling. The spacing between the hanging
hooks should be 22.1 in.
3
Install the cable clips into the slotted holes on the end caps of the xture.
Make the cable clips snap on.
4
Slide the 6 in. hanging cables into the cable clips.
Fixture Flushmount Screw Installation
1
ENSURE THE FIXTURE IS NOT PLUGGED IN TO THE ELECTRICAL POWER.
2
Install two screws on the mounting surface. The spacing between the screws should be 22.6 in. The spacing
between the screw head and the mounting surface should be 0.1 in.
D=0.1 in.
3
Lift the xture up to the screws and slide to one side to secure the xture into place. The xture should be rmly xed
against the screws. Plug in the power cord to the outlet and plug other end to the xture. Make sure to switch the xture on.
FEIT ELECTRIC COMPANY | PICO RIVERA, CA | (800) 543-3348 | FAX (562) 908-6360 | www.feit.com
22.1 in.
Ceiling
screw
1
screw
5
Hang the hanging cables onto the hanging hooks.
6
Plug in the power cord to the outlet and plug the other end to the
xture. Make sure to switch the xture on.
7
Use a zip tie to attach the power cord to the hanging cable.
22.6
in.
Recommended screw dimensions: Head: 0.27~0.34 in., Screw: 0.16~0.17 in.
1