ACO ShowerDrain Lightline Installation Notes

Advertisement

Quick Links

I n s t a l l a t i o n n o t e s
ACO ShowerDrain Lightline
This operating-/assembly instruction applies for the
ACO Showerdrain Lightline LED showerdrain illumina-
tion and contains important information! It must be
handed out to the end user who must keep it in a safe
place!
Product description
The ACO ShowerDrain Lightline illumination system consists of two
accumulator-operated LED modules and a charging device. The LED
modules are fixed to the stainless steel design gratings with the
fixing pins included in scope of supply.
The LED modules start lighting when coming in contact with water.
After taking a shower, the modules still light up for approx. two mi-
nutes before they switch off automatically.
Charging process prior to initial use
Prior to initial use, the LED modules must be fully charged. This pro-
cess may take up to 18 hours. It must be made sure that the metal
contacts of the LED modules are free from dust, dirt and moisture.
Charging process during use
Depending on frequency of use, the LED modules must be rechar-
ged every three months. Before the LED modules are inserted in the
charging device, they have to be cleaned with warm water and to be
completely dried thereafter. The metal contacts of the LED modules
must be free from dust, dirt and soap residues.
Inserting the LED modules in the charger
It must be paid attention that the modules are correctly inserted
in the charging device. Please take correct positioning from fig. 1.
Lamps of LED modules must always point downwards.
Fig. 1
Service-Line
Tel. +49 (0) 36965 819–0
Fax +49 (0) 36965 819–361
ACO H a u s t e c h n i k
Control lamps at the charging device
Meaning
Charging lamps state
Charging of LED modules takes place
Normal blinking
Accumulator voltage already intensely dropped
Rapid blinking
or accumulator damaged. The charging device
nevertheless tries to recharge this LED module.
If, during the charging process, the charging
device does not switch over to slow blinking
(normal charging) within one hour, the LED mo-
dule is defective and may no longer be used.
Charging process finished
Permanent lighting
Caution!
The charging device may be damaged if LED modules are
incorrectly inserted.
1
0154.31.13 A
As per: 04/2010

Advertisement

loading

Summary of Contents for ACO ShowerDrain Lightline

  • Page 1 ACO H a u s t e c h n i k I n s t a l l a t i o n n o t e s 0154.31.13 A As per: 04/2010 ACO ShowerDrain Lightline This operating-/assembly instruction applies for the...
  • Page 2 Initial Installation of LED modules in the Servicing and maintenance stainless steel design grating The LED modules have to be cleaned depending on frequency of Except from the «Tile» design, the LED modules can be inserted into showering. To do this, clean the contacts with warm water and a all stainless steel design gratings.
  • Page 3 ACO H a u s t e c h n i k I n s t a l l a t i o n n o t e s 0154.31.13 A As per: 04/2010 Proper use Load the product only up to the indicated capacity. An...
  • Page 4 I n s t a l l a t i o n n o t e s As per: 04/2010 Origin: German manual Subject no. 0154.31.13 A ACO Passavant GmbH Im Gewerbepark 11c 36457 Stadtlengsfeld Tel. +49 (0) 36965 819–0 Fax +49 (0) 36965 819–361 www.aco-haustechnik.de The ACO Group. A strong family you can build on.