Installation; Unpacking The Product; Installation Premises; Assembly - Riello RSS R Installation And Maintenance Manual

Table of Contents

Advertisement

INSTALLATION

8 UNPACKING THE PRODUCT

Package content
3
1
Solar Station
In a plastic bag, the following material is also supplied:
2
Instruction manual
3
Circulator cover with logo (to be mounted during installa-
tion)
4
Wirings.
9
The instruction manual is an integral part of the appliance;
therefore, it should be read and stored carefully.

9 INSTALLATION PREMISES

9
When installing the boiler, allow sufficient space around it
to access all safety and control devices and to permit easy
maintenance.
9.1
Recommended minimum distances
Recommended distances for assembly and maintenance are
300 mm on each side (including expansion tank).
Put the solar station at a proper hight to allow thermometer and
pressure gauge reading.
1
4
≥ 0
, 3
m
≥ 0
, 3
m

10 ASSEMBLY

− Remove the front insulation (1)
− Mark mounting points (F) on the wall and drill
− Insert blocks (not supplied)
1
2
9
Use suitable wall-mounting bolts and blocks.
− Set solar station at the centre
− Fasten the solar station with the fixing bracket (4), the
screws (2) and the washers (3) not supplied.
4
3
Installation
5
INSTALLATION
2 3
1
0
F
7 0
m m
F
3
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

20116168

Table of Contents