Download Print this page

Raita BioModule Manual Installation page 16

Advertisement

Available languages

Available languages

SUOMI
SVENSKA
ENGLISH
BioModule
Raita
MANUAL - INSTALLATION
ENGLISH
Pipe connections, ventilation
The property's sewer pipe is connected to the pre-treatment inlet (sludge separator, BioBox or other device) and
the pipe leaving the pre-treatment device is connected to the distribution pipe in the BioModul system (1). In large
systems (several module rows) there may be a distribution well before the module fsystem.
If the property has waste water ventilation (3) on the roof of the building, the ventilation will be through it, unless
ventilation can be done through pipes (above the ground) from the inlet sewage piping (4).
Incoming air to the system is also needed; from the pipeline to open ditches or from an infitration, collection, or
sampling well (3).
(3)
(3)
© Raita Environment 2020
Installation, generally
Content of the delivery, accessories
Piping, ventilation
Installation posibilities
Use, generally
Controll, service
15 (18)

Advertisement

loading

Related Products for Raita BioModule