Glasdon FUSION LITTER BIN Instruction Leaflet

Advertisement

Slot
Peg
FUSION
IMPORTANT NOTE: ENSURE THAT ALL RELEVANT PERSONNEL READ THESE INSTRUCTIONS PRIOR TO USE

To Remove and Replace Dome Top (Sack Retention or Solid Liner Model)

1.
Insert key and twist
clockwise.
4.
Replace the Dome Top
into the recess at the
top of the bin.
7.
Push the lock back in to
secure the Dome Top
to the bin.
TM
Operator Instruction Leaflet
2.
Slot
Peg
Twist Dome Top
anticlockwise.
5.
Slot
Peg
Twist anitclockwise until
the slots drop over the
pegs on the bin rim,
locating the Top.

To Remove and Replace Solid Liner

8.
Remove Dome Top, if used,
and use handles on Liner Rim
to lift Liner in and out of the bin.
LITTER BIN
3.
Lift Dome Top from the
6.
1
bin.
Slot
Peg
When the Top is fitted
over the pegs, Twist
clockwise to secure.
Slot
Peg

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FUSION LITTER BIN and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Glasdon FUSION LITTER BIN

  • Page 1 Slot FUSION LITTER BIN Operator Instruction Leaflet IMPORTANT NOTE: ENSURE THAT ALL RELEVANT PERSONNEL READ THESE INSTRUCTIONS PRIOR TO USE To Remove and Replace Dome Top (Sack Retention or Solid Liner Model) Slot Slot Lift Dome Top from the Insert key and twist Twist Dome Top bin.
  • Page 2 FUSION LITTER BIN To Remove and Replace Locking Liner Lift the locking bar Push the Locking bar Insert Key and twist upwards from its seated across into its unlocked clockwise to unlock. position - the location slot resting position. will guide its movement. In this resting position, Lift the Liner from the Upon replacement...
  • Page 3 FUSION LITTER BIN To Secure a Sack in Position (Open Top or Dome Top Model) Slot Remove Dome Top, Pull the sack bands Pull the sack up from if used, by following upwards. within the bin and wrap instructions 1-3. over the sack bands.
  • Page 4 Please refer to ‘The Manual Handling Operations Regulations 1992’. Glasdon recommends that a full Health and Safety analysis is carried out prior to installation. Note: Always check thoroughly for buried services...

Table of Contents