Download Print this page

PROLED MYKONOS Installation Manual page 4

Bollard

Advertisement

Available languages

Available languages

Installation pictures:
1.
3.
5.
3x Ø10 hole 75 mm deep
Pipe with power line
7.
M8 screw
M8 spring washer
M8 washer
9.
05.20 Technical amendments reserved
MBN GmbH
H = 550 / 800 mm
Pipe Ø25 with
power line
Concrete
Remove base
and
install on concrete.
Tighten the screws with
cross screw driver
Balthasar-Schaller-Str. 3
www.proled.com
Montageanleitung / Installation manual
2.
1 = Light output
2 = Luminiare body
3 = Base plate
4.
6.
M8 screw
M8 spring washer
M8 washer
Pipe with power line
Concrete
8.
IP65 connectors
86316 Friedberg
Concret
e
Germany

Advertisement

loading

This manual is also suitable for:

Kos