Spectron BM50 Series Operating Manual

High-pressure panels

Advertisement

Quick Links

Opera
H
igh-Pr
of t
the BM
BM
M50-1 (one-
-sided)
ating M
Manua
for the
e
ressur
re Pan
nels
M50/B
E50 se
BM
M50-2 (two-s s ided)
al
eries

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BM50 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Spectron BM50 Series

  • Page 1 Opera ating M Manua for the igh-Pr ressur re Pan nels of t the BM M50/B E50 se eries M50-1 (one- -sided) M50-2 (two-s s ided)
  • Page 2: Table Of Contents

    Operating Manual of the BM/BE series Contents Contents ........................2  1.  Introduction ......................3  1.1  General ......................3  1.2  Description of the high-pressure panels of the BM and BE series ....3  1.3  Intended use ....................4  1.4  Personnel requirements .................. 4  2. ...
  • Page 3: Introduction

    All rights reserved. Updates No update service is provided for this operating manual by Spectron Gas Control Systems GmbH. Changes can be made to this operating manual without the need to notify anyone about them. Description of the high-pressure panels of the BM and BE series Spectron high-pressure panels are available in BM and BE versions.
  • Page 4: Intended Use

    Operating Manual of the BM/BE series Introduction Intended use Intended use The BM50-1 and BM50-2 high-pressure panels described are intended for use with non-corrosive gases up to a purity grade of 6.0. The BE50-1 and BE50-2 high-pressure panels are suitable, in addition, for corrosive gases up to a purity grade of 6.0.
  • Page 5: For Your Safety

    Operati ng Manua of the B BM/BE ser ries For your r safety Symbo ls used Note! mportant! ! Warning g! Dange nger s symbol in ndicates the risk of a fa atal injury. Essent ial safety in nformation  ...
  • Page 6: Safety Information

    Operating Manual of the BM/BE series For your safety Safety information Possible hazard Hazard-prevention measures Risk of fatal injury! Keep all parts that come into contact with oxygen free of oil and grease. If oxygen comes into contact with oil or grease, there is a risk of fire due to a chemical reaction.
  • Page 7: Description

    Operating Manual of the BM/BE series Description Overview of the high-pressure panel Drawing of the high-pressure panel BM50-1BM50-2 Elements of the high-pressure panel Item Designation Function Distributor block Connecting point for the pipe system. Waste gas valve or purge Is opened to remove the waste gases or vent the process gas pipe. valve Optionally pneumatic Process gas valve...
  • Page 8: Functional Description

     Note The technical data can be taken from the Spectron data sheet for the relevant product. If this is not available, you can view and download it at www.spectron.de. The maximum inlet and outlet pressures and the gas type are indicated on the type plate.
  • Page 9: Operation

    Only the gas type for which the high-pressure panel was ordered may be specified on it. Installing the high-pressure panel  Note You can find instructions on how to install the high-pressure panel in the installation manual MA_BM+BE. You can view and download this at www.spectron.de. GES_BM+BE_50_1115.docx...
  • Page 10: Putting The High-Pressure Panel Into Operation For The First Time

    Operating Manual of the BM/BE series Operation Putting the high-pressure panel into operation for the first time Important Before putting the high-pressure panel into operation for the first time, it must be purged from the process gas valve to the consumer. It is imperative to adhere to the direction of the gas flow when doing this.
  • Page 11: Changing The Cylinder

    Operating Manual of the BM/BE series Operation Changing the cylinder Important Each time you change the cylinder, check that the gasket is in perfect condition and replace it if necessary.  Note Each time you change the cylinder, ambient air gets into the connecting parts of the system. To prevent the gas and the entire system from being contaminated, the connection must be purged before gas is drawn from the cylinder again.
  • Page 12: Taking The Equipment Out Of Operation

    Operating Manual of the BM/BE series Operation Taking the equipment out of operation Taking out of operation or interrupting operation for a short period When interrupting operation for a short period, all you need to do is close the process gas valve. The red marking in the handwheel window indicates immediately that the valve is closed.
  • Page 13: Maintenance, Cleaning And Repairs

    Repairs may only be carried out by specialist personnel in authorised repair workshops. After repairs, the entire high-pressure panel must be checked in accordance with the original Spectron inspection instructions. Safe and reliable operation can only be guaranteed if original spare parts are used.