Cisco 3000 Series Hardware Installation And Maintenance page 35

Hide thumbs Also See for 3000 Series:
Table of Contents

Advertisement

on
Wall
Installing
Holes
Figure
Wall
on
DnstaUng
When
wall
Note
commonly
1/2
wood
Step
Cisco 3000
Hardware
3-4
Installation
Front
3-3
Position
of
Mounting
flrackets
on which
the wall
choosing
To
system on
structure
install
the
The
bracket
mounting
points
used
for wall
studs
on
then
mount
the bracket
wall
the
Position
the chassis against the
on
of keyhole
cutouts
the
and Maintenance
side
Angled
Back
Chassis
front
on Router
mount
the chassis
consider
to
wall
follows
proceed
as
wide enough
accommodate
not
are
to
Mount
boards
piece
the
Ensure
plywood
to
shown
board
in
as
Figure
mark
the
mounting
bracket
to
and
cable
limitations
lengths
16
16
the
spacing
16
minimum
of
plywood
chassis
anchored
that
the
is
3-4 Use
the lower
of each
points
drilling
and
16
to solid
pair

Advertisement

Table of Contents
loading

This manual is also suitable for:

320232043101310231033104

Table of Contents