Download Print this page
wallhugger S-cape 2MR Operation Manual

wallhugger S-cape 2MR Operation Manual

Hand control

Advertisement

www.adjustablesbyleggett.com
S-cape 2MR
S-cape 2MR
hand control
hand control
OPERATION GUIDE
99300906 EDR10731 7/06
TM

Advertisement

loading
Need help?

Need help?

Do you have a question about the S-cape 2MR and is the answer not in the manual?

Questions and answers

Michael
February 23, 2025

I have a select comfort sleep number 5000 model remote that is the adjustable not the firmness remote that I’m struggling to pair

User image 67bba95802340

Subscribe to Our Youtube Channel

Summary of Contents for wallhugger S-cape 2MR

  • Page 1 S-cape 2MR S-cape 2MR hand control hand control OPERATION GUIDE 99300906 EDR10731 7/06 www.adjustablesbyleggett.com...
  • Page 3: Table Of Contents

    CONTENTS S-cape ™ 2MR Function ....................4 “J Box” Programming Procedure .................. 5 Power Down Box Operation ................... 5 S-cape ™ 2MR Programming (1 hand control - 1 bed) ..........6 ™ S-cape 2MR Programming (2 hand controls - 1 bed) ..........7 ™...
  • Page 4: S-Cape ™ 2Mr Function

    ™ S-CAPE 2MR FUNCTION IMPORTANT INFORMATION READ ADVISORY INFORMATION IN THE OWNERS MANUAL CAREFULLY BEFORE USING THIS PRODUCT. THE POTENTIAL FOR ELECTRICAL SHOCK EXISTS IF ELECTRICAL COMPONENTS ARE NOT INSTALLED OR OPERATED PROPERLY. CUSTOM POSITION SET TRANSMISSION INDICATOR LIGHT BUTTON Verifies a button is being pressed and Press to capture any position or data is being sent to the bed.
  • Page 5: J Box" Programming Procedure

    “J BOX” PROGRAMMING PROCEDURE “J BOX” PROGRAMMING For adjustable beds equipped with “J box” only—no power down box. When programming the hand control, At any point where “press the learn unplug the adjustable bed electrical button” is designated, disconnecting and power cord.
  • Page 6: S-Cape ™ 2Mr Programming (1 Hand Control - 1 Bed)

    ™ S-CAPE 2MR PROGRAMMING 1 hand control - 1 bed The two step procedure below is required to program 1 hand control to operate 1 bed. Before beginning, make certain the bed is plugged into a working grounded electrical outlet. If programming fails, initiate the programming procedure a second time.
  • Page 7: S-Cape ™ 2Mr Programming (2 Hand Controls - 1 Bed)

    ™ S-CAPE 2MR PROGRAMMING 2 hand controls - 1 bed The three step procedure below is required to program 2 hand controls to operate 1 bed. Before beginning, make certain the bed is plugged into a working grounded electrical outlet. If programming fails, initiate the programming procedure a second time.
  • Page 8: S-Cape ™ 2Mr Programming (1 Hand Control - 2 Beds)

    ™ S-CAPE 2MR PROGRAMMING 1 hand control - 2 beds The three step procedure below is required to program 1 hand control to operate 2 beds. Before beginning, make certain the beds are plugged into a working grounded electrical outlet. If programming fails, initiate the programming procedure a second time. STEP 3 STEP 1 Repeat Step 1 and Step 2 with bed 2.
  • Page 9: S-Cape ™ 2Mr Programming (2 Hand Controls - 2 Beds)

    ™ S-CAPE 2MR PROGRAMMING 2 hand controls - 2 beds The six step procedure below is required to program 2 hand controls to operate 2 beds. Before beginning, make certain the beds are plugged into a working grounded electrical outlet. If programming fails, initiate the programming procedure a second time. NOTE: OPERATE ONLY ONE (1) HAND CONTROL AT A TIME.
  • Page 10: S-Cape ™ 2Mr Reprogramming (Separating 2 Beds)

    ™ S-CAPE 2MR REPROGRAMMING separating 2 beds The six step procedure below is required to seperate 2 hand controls from operating 2 beds. One hand contol per bed operation will result. Before beginning, make certain the beds are plugged into a working grounded electrical outlet.
  • Page 12 For customer care online, email: accustomerservice@leggett.com www.adjustablesbyleggett.com...
Save PDF