Download Print this page

ALPHA PLAM ALPHA FURNACE 2014 Instructions For Installation, Adjustment And Use

Solid fuel programme

Advertisement

Quick Links

METALNA INDUSTRIJA AD
RADNIČKA 1, 17 500 VRANJE, SERBIA
TEL 017 421 121
SOLID FUEL PROGRAMME
ALPHA FURNACE 2014
INSTRUCTIONS FOR INSTALLATION, ADJUSTMENT
AND USE

Advertisement

loading
Need help?

Need help?

Do you have a question about the ALPHA FURNACE 2014 and is the answer not in the manual?

Questions and answers

Summary of Contents for ALPHA PLAM ALPHA FURNACE 2014

  • Page 1 METALNA INDUSTRIJA AD RADNIČKA 1, 17 500 VRANJE, SERBIA TEL 017 421 121 SOLID FUEL PROGRAMME ALPHA FURNACE 2014 INSTRUCTIONS FOR INSTALLATION, ADJUSTMENT AND USE...
  • Page 2: General Information

    GENERAL INFORMATION Generally speaking, it is necessary to comply with the current building rules and regulations for fireboxes in the country of use, as well as with all local, national and European standards. Important before use: Make sure your furnace operates properly; it is important to read this manual carefully and to strictly follow the instructions therein.
  • Page 3 1. ALPHA FURNACE 2014 SPECIFICATIONS - rated thermal power........................11 KW - rated efficiency..........................76 % - required chimney airflow .......................12 Pa - width………………………..………....................750mm - depth…………………………….…………………..............…...400mm -height...............................803mm - flue pipe diameter........................Ø 210mm - the height from the floor to the axis of the flue………………………………………………………….652mm - combustion chamber volume………………………………………………………………………..18dm...
  • Page 4 2. Warning before use: Make sure you read the instructions manual Once you remove the packaging, you need to inspect whether the furnace is complete in terms of the basic elements, and whether the fire-resistant glass on the front side is in good condition. 3.
  • Page 5 4. Furnace Installation Before setting up the chimney to the flue installation, you should check the diameter on the wall in the chimney to see whether it is Ø 210 mm or Ø 120 mm. If it is Ø 210 mm, connect directly, and if it is Ø 120 mm, you need to reduce the Ø...
  • Page 6 protected must be at least 30 cm on the side and 30 cm on the back of the furnace. Flammable items need to be at a distance of at least 80 cm from the opening of the furnace. You should leave sufficient space between the furnace and the flammable objects (wood paneling, furniture, curtains, etc.).
  • Page 7 6. Putting the Furnace into Operation Before the first use of the furnace, you need to wipe the enamel surfaces with a damp cloth in order to avoid staining. Painted surfaces are not to be touched, nor are there any objects to be left on the furnace in order to prevent paint damage.
  • Page 8 7. Handling and Usage Before firing the chimney, the throttle shaft should be turned into a horizontal position (Figure 4, position 8). Firing of the furnace is done with paper and fine chopped wood (when the regulators on the front of the furnace are opened all the way) positioned on the grid.
  • Page 9: Warranty Conditions

    Grill shaking is done using the handle shown in Figure 8, position 10. Fig. 8 General Information If you follow the instructions for installation and use of the furnace, this furnace will be a reliable source of heat. Our service center can solve all of your problems with the furnace. In case of complaints regarding the problems or errors when it comes to functionality, please contact our service center.