Do you have a question about the DK2 POWER OPS240 and is the answer not in the manual?
Questions and answers
Summary of Contents for Kohler DK2 POWER OPS240
Page 1
Las Vegas, NV 89103 Burlington, Ontario, Canada L7L0A1 Whitehouse, OH 43571 1-702-331-5353 PARTS AND SERVICE 702-331-5353 OR WWW.DK2POWER.COM CONTACT US HIGH SPEED LOG SPLITTER 1 SEC RAM SPEED ATV TOWABLE KOHLER ENGINE OPS240 KINETIC 40TON LOG SPLITTER REV 1 – 9-19-2019...
Page 2
STEP 1: Open and unpack all items. Leave lots of working space. Inspect all parts. The SPLITTER is shipped in a crate. Remove all sides before you begin. NOTE: UPON INSPECTION OF PARTS IF YOU FIND ANY DAMAGE OR MISSING PARTS PLEASE CALL DK2 POWER AT 702-331-5353 OR CONTACT US VIA OUR WEBSITE WWW.DK2POWER.COM...
Page 3
STEP 2: 1. Install cross frame and tow bar frame. 2. Use 4 bolt hardware included. 4 BOLTS AND NUTS REV 1 – 9-19-2019...
Page 4
STEP 3: 1. Open the hood 2. Install the safety lock control handle. Screw it until tight into the locking casting. REV 1 – 9-19-2019...
Page 5
STEP 4: 1. Install the split handle with hardware provided 2. Close and latch the hood NUT THIS SIDE REV 1 – 9-19-2019...
Page 6
STEP 5: 1. INSTALL THE FOOT STAND 2. BOLT BOTTOM HOLE 3. HITCH PIN TOP HOLE 1 hitch pin on top Raise when towing – use 1 BOLT on bottom hitch pin in bottom hole REV 1 – 9-19-2019...
Page 7
STEP 6: 1. INSTALL TOW BAR 2. Secure tight using hardware provided. Use 2 bolts provided REV 1 – 9-19-2019...
Page 8
STEP 7: 1. Install the front table bracket as shown using the hardware provided. 2. KEEP LOOSE until after table installation to help with hole alignment. Use 2 bolts provided REV 1 – 9-19-2019...
Page 9
STEP 8: 1. Install the wheels on the axel and insert spring pin. 2. Make sure wheel is free spinning. You can remove pin, slide wheel and re-pin to lock wheel during splitting. REV 1 – 9-19-2019...
Page 10
STEP 9: 1. Get some help lifting the unit by the hitch and standing the unit upright resting on the back bottom plate. 2. Another option is use safely a hydraulic jack or lift chain. 3. BE CAREFUL THIS IS UNIT IS HEAVY AND SHOULD BE HANDLED BY MULTIPLE PERSONS OR A SAFE LIFTING DEVICE.
Page 11
STEP 10: 1. Assembly LOG CRADEL SLIDES to side of beam as shown. 2. Use hardware supplied and bolt both rail cradle assemblies together. 3. Tighten all bolts securely. Bolt through the Beam both together REV 1 – 9-19-2019...
Page 12
STEP 11: 1. Install the work table 2. Use the 8 flat bolts and hardware provided 3. Tighten the 2 bolts on the underside table supports that were left loose in previous assembly steps. 4. Recheck all assembly bolts and equipment bolts and tighten if required.
READ THE KOHLER ENGINE MANUAL SUPPLIED WITH YOUR UNIT FOR FULL ENGINE OPERATION, SAFETY, AND MAINTENANCE. YOUR UNIT HAS A COMMERCIAL KOHLER ENGINE WITH A 3YR PARTS AND SERVICE WARRANTY. FOR WARRANTY IN YOUR AREA CONTACT THE NEAREST KOHLER DEALER.
Page 16
OPERATION – BEFORE STARTING ENGINE CLEAR AREA OF ALL PEOPLE AND PROPERTY THAT COULD BE DAMAGED. THINK SAFETY. THIS SPLITTER IS FAST AND CAN CAUSE INJURY IF SAFETY IS NOT ENFORCED. ONLY ONE OPERATOR SHOULD WORK THIS UNIT. NEVER HAVE ANOTHER PERSON LOADING LOGS WHILE ANOTHER IS AT THE CONTROLS.
Page 17
KOHLER ENGINES – KOHLER CH SERIES ENGINES COMMERCIAL 3 YR PARTS AND LABOR WARRANTY see your Kohler manual for specific warranty. DIESEL TRACTORS – Chassis component parts only, no labor, ENGINES – 1 YR KOHLER WARRANTY DK2 POWER OUTDOOR EQUIPMENT – 1-Year parts only, no labor.
Need help?
Do you have a question about the DK2 POWER OPS240 and is the answer not in the manual?
Questions and answers