Siena Recesso, Lastra and Trucco Installation (#'s SI-IN-36, SI-CS-36, SI-MK-36)
Please read these instructions carefully before you begin. Also, review the recommended tools
section and lay out all components to assure you have the correct tools, items and quantities needed
for proper installation.
Note: The Siena Collection is designed to be installed on a flat and level surface. Any variation in this will
require the use of shims. It will also add time to the installation.
Caution! Stone sinks, countertops and vanities are very heavy. Please use care and caution when handling.
Important: Do not use an oil-based sealer, silicone, or plumbers putty. These products will stain if applied
near the surface. Use a latex-based caulk recommended for use with tile and stone.
All installation procedures must comply with all applicable local plumbing and building codes.

Required tools:

Material Lift
Drill/driver
Additionally for the Recesso Sink, #SI-IN-36:
Adhesive Caulk/Sealant such as DAP Qwikseal

Supplied parts:

Wood Screws #8 x ¾"L(x6)
Machine Screws ¼"-20 x ¾"L(x18)
Level
5 minute clear epoxy
Tape Measure
Wood blocks
®
or
Henkels Polyseam Seal
Rubber Mallet
Short handled philips screwdriver
®

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Siena Recesso SI-IN-36 and is the answer not in the manual?

Questions and answers

Summary of Contents for Stone Forest Siena Recesso SI-IN-36

  • Page 1 Siena Recesso, Lastra and Trucco Installation (#’s SI-IN-36, SI-CS-36, SI-MK-36) Please read these instructions carefully before you begin. Also, review the recommended tools section and lay out all components to assure you have the correct tools, items and quantities needed for proper installation.
  • Page 2 Instructions: SI-CS-36, Lastra Console 1. Carefully position legs in desired location. The legs and top are marked indicating right and left, as well as front/back. Be sure to set the legs in the correct orientation to the top. Leave about 30” between the legs and check for level and plumb.
  • Page 3 Fig. 1 Fig. 2 Sizes and weight capacities of lifts vary by rental location and company. Confirm that the rental company can supply one that will fit in the bathroom where the Siena is being installed and also between the legs of the unit. Fig.
  • Page 4 Fig. 5 Fig. 6 Fig. 7 Care & Maintenance: -Wipe the stone dry with a soft cloth after each use. -Clean regularly with a granite & marble cleaner, such as Marbamist by Stone Care International. If a household cleaner is used, it must specifically state ‘safe for marble’, and have a neutral pH of 7.0. Use of any other product may alter the effectiveness of the sealer.

This manual is also suitable for:

Siena lastra si-cs-36Siena trucco si-mk-36

Table of Contents